PRODUCTION SYSTEM MODELING OF THE GAS LIFTED WELL BY MEANS OF THE PROGRAM PROSPER

A production system analysis was made for the well Šandrovac-136 equipped with a continuous gas lift. The analysis was based on the test data which served as the foundation for creating a production well model in computer program ‘PROSPER’ (Version 10.3, License 2681). The importance of the measured...

Full description

Bibliographic Details
Main Authors: Sonja Koščak Kolin, Zvonimir Korenjak, Marin Čikeš
Format: Article
Language:English
Published: Faculty of Mining, Geology and Petroleum Engineering 2009-12-01
Series:Rudarsko-geološko-naftni Zbornik
Subjects:
Online Access:http://hrcak.srce.hr/index.php?show=clanak&id_clanak_jezik=72950&lang=en
Description
Summary:A production system analysis was made for the well Šandrovac-136 equipped with a continuous gas lift. The analysis was based on the test data which served as the foundation for creating a production well model in computer program ‘PROSPER’ (Version 10.3, License 2681). The importance of the measured data in well modeling is accuracy and reliability in predicting future developments of the production system. The model design can be divided in six steps among which the most important are: calculation of the IPR curve, calculation of the gas lift system and matching of VLP and IPR curves based on the well testing. The aim of the VLP/IPR matching is to choose an appropriate method for calculating the pressure drop gradient by applying the nonlinear regression method, which results in the system working point adjusted to the measured data. This model was applied in sensitivity analysis of the well, in which three key variables are selected to predict their effect on future system changes, primarily on changes of the production and bottom dynamic pressure (the paper is published in Croatian).
ISSN:0353-4529
1849-0409