4D Applications of GIS in Construction Management

Construction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP). But the software still lacks a feature of providing spatial aspects of information in constru...

Full description

Bibliographic Details
Main Authors: A. Chaitanya Kumar, T. Reshma
Format: Article
Language:English
Published: Hindawi Limited 2017-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2017/1048540
id doaj-20ccea054ff642ec8fe5cece0d85f5dc
record_format Article
spelling doaj-20ccea054ff642ec8fe5cece0d85f5dc2020-11-24T22:59:11ZengHindawi LimitedAdvances in Civil Engineering1687-80861687-80942017-01-01201710.1155/2017/104854010485404D Applications of GIS in Construction ManagementA. Chaitanya Kumar0T. Reshma1KL University, Vaddeswaram, Guntur, Andhra Pradesh, IndiaDepartment of Civil Engineering, KL University, Vaddeswaram, Guntur, Andhra Pradesh, IndiaConstruction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP). But the software still lacks a feature of providing spatial aspects of information in construction schedule. Recently, advanced technology like 4D GIS plays a major role in overcoming the limitation of the software. 4D GIS technology includes integration of 2D drawings from AutoCAD and schedules prepared in PRIMAVERA software. In the present study, a multistair residential building has been selected. ARCMAP 10.2 is used for interlinking of schedules as well as drawings and ARCSCENE has been used for developing 4D view. This linkage between scheduled activities and respective drawings in GIS helps in identifying construction sequences and also in detecting logical errors that occur in project schedules. The developed 4D view provides better visualization of construction progress of a project.http://dx.doi.org/10.1155/2017/1048540
collection DOAJ
language English
format Article
sources DOAJ
author A. Chaitanya Kumar
T. Reshma
spellingShingle A. Chaitanya Kumar
T. Reshma
4D Applications of GIS in Construction Management
Advances in Civil Engineering
author_facet A. Chaitanya Kumar
T. Reshma
author_sort A. Chaitanya Kumar
title 4D Applications of GIS in Construction Management
title_short 4D Applications of GIS in Construction Management
title_full 4D Applications of GIS in Construction Management
title_fullStr 4D Applications of GIS in Construction Management
title_full_unstemmed 4D Applications of GIS in Construction Management
title_sort 4d applications of gis in construction management
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8086
1687-8094
publishDate 2017-01-01
description Construction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP). But the software still lacks a feature of providing spatial aspects of information in construction schedule. Recently, advanced technology like 4D GIS plays a major role in overcoming the limitation of the software. 4D GIS technology includes integration of 2D drawings from AutoCAD and schedules prepared in PRIMAVERA software. In the present study, a multistair residential building has been selected. ARCMAP 10.2 is used for interlinking of schedules as well as drawings and ARCSCENE has been used for developing 4D view. This linkage between scheduled activities and respective drawings in GIS helps in identifying construction sequences and also in detecting logical errors that occur in project schedules. The developed 4D view provides better visualization of construction progress of a project.
url http://dx.doi.org/10.1155/2017/1048540
work_keys_str_mv AT achaitanyakumar 4dapplicationsofgisinconstructionmanagement
AT treshma 4dapplicationsofgisinconstructionmanagement
_version_ 1725645415798276096