Timing of efficient snow clearance for summer operation at Syowa Station

Some construction and outworks are conducted at Syowa Station during the period between the middle of December and middle of February every season. Before the outworks, main roads for cargo transportation and new outwork sites need to be cleared of snow by the wintering members. The clearance work o...

Full description

Bibliographic Details
Main Author: Kenji Ishizawa
Format: Article
Language:English
Published: National Institute of Polar Research 2018-03-01
Series:Antarctic Record
Subjects:
Online Access:http://doi.org/10.15094/00014896
id doaj-91526b3fd5f4458e9f24dbe9ea5986ae
record_format Article
spelling doaj-91526b3fd5f4458e9f24dbe9ea5986ae2020-11-24T22:37:17ZengNational Institute of Polar ResearchAntarctic Record0085-72892432-079X2018-03-016211410.15094/00014896Timing of efficient snow clearance for summer operation at Syowa StationKenji Ishizawa0National Institute of Polar ResearchSome construction and outworks are conducted at Syowa Station during the period between the middle of December and middle of February every season. Before the outworks, main roads for cargo transportation and new outwork sites need to be cleared of snow by the wintering members. The clearance work of snow is carried out depending on the respective plans by each wintering parties because there are not any manuals referring to the timing of the operation and the method. Therefore, some clearance works were not efficient because they started the work too early without plenty of solar radiation or they suffered from blizzards after completing the snow removal. To work out the best moment of the operation, meteorological data such as air temperature, snow depth, solar radiation and blizzard over previous years at Syowa Station were analyzed. As a result, it was found that the snow-removal operation including treatment of snow melting agent should start from the middle of November.http://doi.org/10.15094/00014896snow clearanceSyowa Stationsolar radiationsnow depthblizzardsnow melting agent
collection DOAJ
language English
format Article
sources DOAJ
author Kenji Ishizawa
spellingShingle Kenji Ishizawa
Timing of efficient snow clearance for summer operation at Syowa Station
Antarctic Record
snow clearance
Syowa Station
solar radiation
snow depth
blizzard
snow melting agent
author_facet Kenji Ishizawa
author_sort Kenji Ishizawa
title Timing of efficient snow clearance for summer operation at Syowa Station
title_short Timing of efficient snow clearance for summer operation at Syowa Station
title_full Timing of efficient snow clearance for summer operation at Syowa Station
title_fullStr Timing of efficient snow clearance for summer operation at Syowa Station
title_full_unstemmed Timing of efficient snow clearance for summer operation at Syowa Station
title_sort timing of efficient snow clearance for summer operation at syowa station
publisher National Institute of Polar Research
series Antarctic Record
issn 0085-7289
2432-079X
publishDate 2018-03-01
description Some construction and outworks are conducted at Syowa Station during the period between the middle of December and middle of February every season. Before the outworks, main roads for cargo transportation and new outwork sites need to be cleared of snow by the wintering members. The clearance work of snow is carried out depending on the respective plans by each wintering parties because there are not any manuals referring to the timing of the operation and the method. Therefore, some clearance works were not efficient because they started the work too early without plenty of solar radiation or they suffered from blizzards after completing the snow removal. To work out the best moment of the operation, meteorological data such as air temperature, snow depth, solar radiation and blizzard over previous years at Syowa Station were analyzed. As a result, it was found that the snow-removal operation including treatment of snow melting agent should start from the middle of November.
topic snow clearance
Syowa Station
solar radiation
snow depth
blizzard
snow melting agent
url http://doi.org/10.15094/00014896
work_keys_str_mv AT kenjiishizawa timingofefficientsnowclearanceforsummeroperationatsyowastation
_version_ 1725717876162166784