Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times
We study a batch scheduling problem on a 2-machine flowshop. We assume unit processing time jobs, batch availability, and machine-dependent setup times. The objective is to find a job allocation to batches of integer size and a batch schedule that minimize makespan. We introduce a very efficient clo...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2009-01-01
|
Series: | Advances in Operations Research |
Online Access: | http://dx.doi.org/10.1155/2009/153910 |