Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times
We study a batch scheduling problem on a 2-machine flowshop. We assume unit processing time jobs, batch availability, and machine-dependent setup times. The objective is to find a job allocation to batches of integer size and a batch schedule that minimize makespan. We introduce a very efficient clo...
Main Authors: | Lika Ben-Dati, Gur Mosheiov, Daniel Oron |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2009-01-01
|
Series: | Advances in Operations Research |
Online Access: | http://dx.doi.org/10.1155/2009/153910 |
Similar Items
-
Batch scheduling of two-machine limited-buffer flowshop with setup and removal times
by: Dai, Jianbin
Published: (2005) -
Manufacture and Assembly Scheduling with Batch Setup Times in a Two-Machine Flowshop
by: Po-ting Chen, et al.
Published: (2008) -
Coordinating Scheduling with Batch Deliveries in a Two-Machine Flowshop
by: Chih-Lun Wu, et al.
Published: (2005) -
Scheduling Distributed Permutation Flowshops with Flexible Assembly Machines and Setup Times
by: SYU, REN-SIOU, et al.
Published: (2019) -
Batch Scheduling to Minimize the Total Completion Time in a Two-Machine Flowshop
by: Han-Kuan Yu, et al.
Published: (1999)