Preventing cascading failure of electric power protection systems in nuclear power plant

Cascading failure is the main cause of large blackouts in electrical power systems; this paper analyzes a cascading failure in Hanbit nuclear power plant unit two (2) caused by a circuit breaker (CB) operation failure. This malfunction has been expanded to the loss of offsite power (LOOP). In this s...

Full description

Bibliographic Details
Main Authors: Moustafa Abdelrahman Mohamed Mohamed Moustafa, Choong-koo Chang
Format: Article
Language:English
Published: Elsevier 2021-01-01
Series:Nuclear Engineering and Technology
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S1738573319306424
id doaj-c5071da058b843c28a445d26421945ac
record_format Article
spelling doaj-c5071da058b843c28a445d26421945ac2021-01-02T05:07:58ZengElsevierNuclear Engineering and Technology1738-57332021-01-01531121130Preventing cascading failure of electric power protection systems in nuclear power plantMoustafa Abdelrahman Mohamed Mohamed Moustafa0Choong-koo Chang1KEPCO International Nuclear Graduate School(KINGS), Department of Nuclear Power Plant Engineering, Republic of KoreaCorresponding author. KEPCO International Nuclear Graduate School(KINGS), 658-91 Haemaji-ro, Seosang-myeon, Ulju-gun, Ulsan, 45014, Republic of Korea.; KEPCO International Nuclear Graduate School(KINGS), Department of Nuclear Power Plant Engineering, Republic of KoreaCascading failure is the main cause of large blackouts in electrical power systems; this paper analyzes a cascading failure in Hanbit nuclear power plant unit two (2) caused by a circuit breaker (CB) operation failure. This malfunction has been expanded to the loss of offsite power (LOOP). In this study, current practices are reviewed and then the methodologies of how to prevent cascading failures in protection power systems are introduced. An overview on the implementation of IEC61850 GOOSE messaging-based zone selective interlocking (ZSI) scheme as key solution is proposed. In consideration of ZSI blocking time, all influencing factors such as circuit breaker opening time, relay I/O response time and messages travelling time in the communication network should be taken into account. The purpose of this paper is to elaborate on the effect of cascading failure in NPP electrical power protection system and propose preventive actions for this failures. Finally, the expected advantages and challenges are elaborated.http://www.sciencedirect.com/science/article/pii/S1738573319306424Cascading failureNuclear power plantProtection power systemIEC61850Zone selective interlock
collection DOAJ
language English
format Article
sources DOAJ
author Moustafa Abdelrahman Mohamed Mohamed Moustafa
Choong-koo Chang
spellingShingle Moustafa Abdelrahman Mohamed Mohamed Moustafa
Choong-koo Chang
Preventing cascading failure of electric power protection systems in nuclear power plant
Nuclear Engineering and Technology
Cascading failure
Nuclear power plant
Protection power system
IEC61850
Zone selective interlock
author_facet Moustafa Abdelrahman Mohamed Mohamed Moustafa
Choong-koo Chang
author_sort Moustafa Abdelrahman Mohamed Mohamed Moustafa
title Preventing cascading failure of electric power protection systems in nuclear power plant
title_short Preventing cascading failure of electric power protection systems in nuclear power plant
title_full Preventing cascading failure of electric power protection systems in nuclear power plant
title_fullStr Preventing cascading failure of electric power protection systems in nuclear power plant
title_full_unstemmed Preventing cascading failure of electric power protection systems in nuclear power plant
title_sort preventing cascading failure of electric power protection systems in nuclear power plant
publisher Elsevier
series Nuclear Engineering and Technology
issn 1738-5733
publishDate 2021-01-01
description Cascading failure is the main cause of large blackouts in electrical power systems; this paper analyzes a cascading failure in Hanbit nuclear power plant unit two (2) caused by a circuit breaker (CB) operation failure. This malfunction has been expanded to the loss of offsite power (LOOP). In this study, current practices are reviewed and then the methodologies of how to prevent cascading failures in protection power systems are introduced. An overview on the implementation of IEC61850 GOOSE messaging-based zone selective interlocking (ZSI) scheme as key solution is proposed. In consideration of ZSI blocking time, all influencing factors such as circuit breaker opening time, relay I/O response time and messages travelling time in the communication network should be taken into account. The purpose of this paper is to elaborate on the effect of cascading failure in NPP electrical power protection system and propose preventive actions for this failures. Finally, the expected advantages and challenges are elaborated.
topic Cascading failure
Nuclear power plant
Protection power system
IEC61850
Zone selective interlock
url http://www.sciencedirect.com/science/article/pii/S1738573319306424
work_keys_str_mv AT moustafaabdelrahmanmohamedmohamedmoustafa preventingcascadingfailureofelectricpowerprotectionsystemsinnuclearpowerplant
AT choongkoochang preventingcascadingfailureofelectricpowerprotectionsystemsinnuclearpowerplant
_version_ 1724359804396240896