Developing Shuffled Frog-Leaping Algorithm (SFLA) Method to Solve Power Load-Constrained TCRTO Problems in Civil Engineering

It is extensively acknowledged that excessive on-site electricity power load often causes power failure across a construction site and surrounding residential zones and can result in unforeseen schedule delay, construction quality problems, life inconvenience, and even property loss. However, energy...

Full description

Bibliographic Details
Main Authors: Xingyu Tao, Heng Li, Chao Mao, Chen Wang, Jeffrey Boon Hui Yap, Samad Sepasgozar, Sara Shirowzhan, Timothy Rose
Format: Article
Language:English
Published: Hindawi Limited 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/1404636