Recognition the risk roots in constructional projects and the methods of their management. (A case study)

There are many ambiguous and unknown features in running and management of different projects especially in constructional projects. Which is called uncertainty? This study tries to recognize the uncertainty cases in constructional projects, then categorize them in risk and opportunities to be analy...

Full description

Bibliographic Details
Main Authors: Mansoor Khaksar, reza shafei, Bahare allah Visi
Format: Article
Language:fas
Published: Islamic Azad University, Tabriz Branch 2009-02-01
Series:مدیریت بهره وری
Subjects:
Online Access:http://jpm.iaut.ac.ir/article_518469_07be81c9aae4e4d8859bef37e4db5a02.pdf
id doaj-ca1c27616a524224b68cf9465e2e540b
record_format Article
spelling doaj-ca1c27616a524224b68cf9465e2e540b2020-11-25T01:27:44ZfasIslamic Azad University, Tabriz Branchمدیریت بهره وری2716-99792476-72982009-02-0124 (7) زمستان139160518469Recognition the risk roots in constructional projects and the methods of their management. (A case study)Mansoor Khaksar0reza shafei1Bahare allah Visi2Assistant Professor and Faculty Member, Department of Management, Sanandaj Branch, Islamic Azad University, Sanandaj, IranAssociate Professor of business management Kurdistan UniversityGraduate Student, Department of Management, Sanandaj Branch, Islamic Azad University, Sanandaj, IranThere are many ambiguous and unknown features in running and management of different projects especially in constructional projects. Which is called uncertainty? This study tries to recognize the uncertainty cases in constructional projects, then categorize them in risk and opportunities to be analyzed so as to design a plan to encounter risks in a proper way and use the opportunities in time. It is a survey and field research. The statistical population was the consulting and construction corporations active in sanandije. The data was gathered through a questionnaire according the standards in risk management (in particular PMBok) and their steps were analyzed. The constructional project dimensions were explained by introducing nine duties of project manager. The findings showed 36 risk items in six categories: technical and technological, work conditions, economical and financial, organizational, sociocultural. The effect of each one of them on project objectives and the importance of each risk was measured. <br />http://jpm.iaut.ac.ir/article_518469_07be81c9aae4e4d8859bef37e4db5a02.pdfconstructional projectproject managementuncertainty riskopportunityrisk management
collection DOAJ
language fas
format Article
sources DOAJ
author Mansoor Khaksar
reza shafei
Bahare allah Visi
spellingShingle Mansoor Khaksar
reza shafei
Bahare allah Visi
Recognition the risk roots in constructional projects and the methods of their management. (A case study)
مدیریت بهره وری
constructional project
project management
uncertainty risk
opportunity
risk management
author_facet Mansoor Khaksar
reza shafei
Bahare allah Visi
author_sort Mansoor Khaksar
title Recognition the risk roots in constructional projects and the methods of their management. (A case study)
title_short Recognition the risk roots in constructional projects and the methods of their management. (A case study)
title_full Recognition the risk roots in constructional projects and the methods of their management. (A case study)
title_fullStr Recognition the risk roots in constructional projects and the methods of their management. (A case study)
title_full_unstemmed Recognition the risk roots in constructional projects and the methods of their management. (A case study)
title_sort recognition the risk roots in constructional projects and the methods of their management. (a case study)
publisher Islamic Azad University, Tabriz Branch
series مدیریت بهره وری
issn 2716-9979
2476-7298
publishDate 2009-02-01
description There are many ambiguous and unknown features in running and management of different projects especially in constructional projects. Which is called uncertainty? This study tries to recognize the uncertainty cases in constructional projects, then categorize them in risk and opportunities to be analyzed so as to design a plan to encounter risks in a proper way and use the opportunities in time. It is a survey and field research. The statistical population was the consulting and construction corporations active in sanandije. The data was gathered through a questionnaire according the standards in risk management (in particular PMBok) and their steps were analyzed. The constructional project dimensions were explained by introducing nine duties of project manager. The findings showed 36 risk items in six categories: technical and technological, work conditions, economical and financial, organizational, sociocultural. The effect of each one of them on project objectives and the importance of each risk was measured. <br />
topic constructional project
project management
uncertainty risk
opportunity
risk management
url http://jpm.iaut.ac.ir/article_518469_07be81c9aae4e4d8859bef37e4db5a02.pdf
work_keys_str_mv AT mansoorkhaksar recognitiontheriskrootsinconstructionalprojectsandthemethodsoftheirmanagementacasestudy
AT rezashafei recognitiontheriskrootsinconstructionalprojectsandthemethodsoftheirmanagementacasestudy
AT bahareallahvisi recognitiontheriskrootsinconstructionalprojectsandthemethodsoftheirmanagementacasestudy
_version_ 1725103497206038528