Stability analysis of large-scale stope using stage subsequent filling mining method in Sijiaying iron mine
To improve mining production capacity, a stage subsequent filling mining (SSFM) method is employed for Sijiaying iron mine. The height of the stage stope is approximately 100 m. As there are farmlands and villages on the surface of the mine, the surface deformation should be controlled when the ore...
Main Authors: | Zhiqiang Yang, Shuhua Zhai, Qian Gao, Maohui Li |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2015-02-01
|
Series: | Journal of Rock Mechanics and Geotechnical Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S167477551400105X |
Similar Items
-
The behaviour of cemented backfill employed in cut and fill stoping /
by: Piciacchia, Luciano, 1959-
Published: (1984) -
Is a three-dimensional-printed tooth filling possible?
by: Muhammet Kerim Ayar
Published: (2016-01-01) -
A New Thin Seam Backfill Mining Technology and Its Application
by: Hengjie Luan, et al.
Published: (2017-12-01) -
On Quasi-Volume-Filling Surfaces
by: Liu, Pan
Published: (2012) -
Performance of paste fill fences at Red Lake Mine
by: Hughes, Paul B.
Published: (2008)