Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
As battery technology matures, the battery energy storage system (BESS) becomes a promising candidate for addressing renewable energy uncertainties. BESS degradation is one of key factors in BESS operations, which is usually considered in the planning stage. However, BESS degradations are directly a...
Main Authors: | Yan Xu, Tianyang Zhao, Shuqian Zhao, Jianhua Zhang, Yang Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
China electric power research institute
2018-09-01
|
Series: | CSEE Journal of Power and Energy Systems |
Online Access: | https://ieeexplore.ieee.org/document/8468670 |
Similar Items
-
Power System Day-Ahead Unit Commitment Based on Chance-Constrained Dependent Chance Goal Programming
by: Zhiwei Li, et al.
Published: (2018-07-01) -
Multi-Objective Day-Ahead Optimal Scheduling of Isolated Microgrid Considering Flexibility
by: Zhang Liang, et al.
Published: (2018-01-01) -
Day-ahead Risk-constrained Stochastic Scheduling of Multi-energy System
by: Yue Yin, et al.
Published: (2021-01-01) -
Multi-Objective Day-Ahead Scheduling of Power Market Integrated With Wind Power Producers Considering Heat and Electricity Trading and Demand Response Programs
by: Chunyan Li, et al.
Published: (2019-01-01) -
Flexible Continuous-Time Modeling for Multi-Objective Day-Ahead Scheduling of CHP Units
by: Elnaz Davoodi, et al.
Published: (2021-04-01)