A Robust Expected Makespan for Permutation Flow Shop Scheduling Depending on Machine Failure Rate

The environment of Flow Shop Scheduling Problems (FSSPs) to minimize the makespan of n jobs that have to be performed on m machines is considered. In real-world manufacturing systems nowadays, the uncertain circumstances to execute these jobs have an essential effect on the final scheduling scheme....

Full description

Bibliographic Details
Main Authors: Ghazwan Alsoufi, Manal Abdulkareem Zeidan, Lamyaa Jasim Mohammed, Abdellah Salhi
Format: Article
Language:English
Published: International Journal of Mathematical, Engineering and Management Sciences 2021-10-01
Series:International Journal of Mathematical, Engineering and Management Sciences
Subjects:
Online Access:https://www.ijmems.in/cms/storage/app/public/uploads/volumes/81-IJMEMS-21-0058-6-5-1345-1360-2021.pdf