Setup of axial bearing capacity of open ended tubular steel piles driven in sand

This paper focuses on the setup of axial bearing capacity of open ended tubular steel piles that are used for offshore foundation systems such as those of wind turbines. A comparative evaluation of the most commonly used models for setup prediction shows an upper estimate bound and a lower estimate...

Full description

Bibliographic Details
Main Authors: Ahlinhan Marx Ferdinand, Adjovi Edmond Codjo
Format: Article
Language:English
Published: Sciendo 2020-03-01
Series:Studia Geotechnica et Mechanica
Subjects:
Online Access:https://doi.org/10.2478/sgem-2019-0032
id doaj-e38f832b7f0342ca963d55a4e9cafddc
record_format Article
spelling doaj-e38f832b7f0342ca963d55a4e9cafddc2021-09-05T14:01:52ZengSciendoStudia Geotechnica et Mechanica2083-831X2020-03-01421748210.2478/sgem-2019-0032sgem-2019-0032Setup of axial bearing capacity of open ended tubular steel piles driven in sandAhlinhan Marx Ferdinand0Adjovi Edmond Codjo1Department of Civil Engineering, 1National University of Sciences, Technologies, Engineering and Mathematics (UNSTIM), Abomey, Republic of BeninDepartment of Civil Engineering, 1National University of Sciences, Technologies, Engineering and Mathematics (UNSTIM), Abomey, Republic of BeninThis paper focuses on the setup of axial bearing capacity of open ended tubular steel piles that are used for offshore foundation systems such as those of wind turbines. A comparative evaluation of the most commonly used models for setup prediction shows an upper estimate bound and a lower estimate bound, which correspond approximately to a setup rate of 60% increase per log cycle of time and 20% increase per log cycle of time, respectively. This finding is validated with the results of case histories reported in literature, which show that the setup values of most case histories considered lie in the best estimate zone between the upper estimate zone and the lower estimate zone. The analysis results show a minimum setup factor of approximately 1.5 for 100 days following end of driving of open-ended tubular steel pile driven in sand.https://doi.org/10.2478/sgem-2019-0032setupaxial bearing capacitydriven open ended pilegranular soilsand
collection DOAJ
language English
format Article
sources DOAJ
author Ahlinhan Marx Ferdinand
Adjovi Edmond Codjo
spellingShingle Ahlinhan Marx Ferdinand
Adjovi Edmond Codjo
Setup of axial bearing capacity of open ended tubular steel piles driven in sand
Studia Geotechnica et Mechanica
setup
axial bearing capacity
driven open ended pile
granular soil
sand
author_facet Ahlinhan Marx Ferdinand
Adjovi Edmond Codjo
author_sort Ahlinhan Marx Ferdinand
title Setup of axial bearing capacity of open ended tubular steel piles driven in sand
title_short Setup of axial bearing capacity of open ended tubular steel piles driven in sand
title_full Setup of axial bearing capacity of open ended tubular steel piles driven in sand
title_fullStr Setup of axial bearing capacity of open ended tubular steel piles driven in sand
title_full_unstemmed Setup of axial bearing capacity of open ended tubular steel piles driven in sand
title_sort setup of axial bearing capacity of open ended tubular steel piles driven in sand
publisher Sciendo
series Studia Geotechnica et Mechanica
issn 2083-831X
publishDate 2020-03-01
description This paper focuses on the setup of axial bearing capacity of open ended tubular steel piles that are used for offshore foundation systems such as those of wind turbines. A comparative evaluation of the most commonly used models for setup prediction shows an upper estimate bound and a lower estimate bound, which correspond approximately to a setup rate of 60% increase per log cycle of time and 20% increase per log cycle of time, respectively. This finding is validated with the results of case histories reported in literature, which show that the setup values of most case histories considered lie in the best estimate zone between the upper estimate zone and the lower estimate zone. The analysis results show a minimum setup factor of approximately 1.5 for 100 days following end of driving of open-ended tubular steel pile driven in sand.
topic setup
axial bearing capacity
driven open ended pile
granular soil
sand
url https://doi.org/10.2478/sgem-2019-0032
work_keys_str_mv AT ahlinhanmarxferdinand setupofaxialbearingcapacityofopenendedtubularsteelpilesdriveninsand
AT adjoviedmondcodjo setupofaxialbearingcapacityofopenendedtubularsteelpilesdriveninsand
_version_ 1717809434692943872