PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem

碩士 === 淡江大學 === 資訊工程學系 === 84 === In academic, industrial and business worlds, hundred of thousands of projectsare undergoing day and night. A project leader may manage one or many projects.A large project funding institute may have tho...

Full description

Bibliographic Details
Main Authors: Wu, Chung-Hao, 吳忠豪
Other Authors: Yuh-Huei Shyu
Format: Others
Language:zh-TW
Published: 1996
Online Access:http://ndltd.ncl.edu.tw/handle/13476103246305606197
id ndltd-TW-084TKU00392024
record_format oai_dc
spelling ndltd-TW-084TKU003920242015-10-13T17:49:30Z http://ndltd.ncl.edu.tw/handle/13476103246305606197 PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem 研究計畫管理環境-進度控制與管理子系統 Wu, Chung-Hao 吳忠豪 碩士 淡江大學 資訊工程學系 84 In academic, industrial and business worlds, hundred of thousands of projectsare undergoing day and night. A project leader may manage one or many projects.A large project funding institute may have thousands of projects to be managedat the same time. It is a quite complicated and messy job to even manage aproject. In order to attack the problems mentioned above, we are developing a projectmanaging environment under UNIX system, which is also named PM-KGB system. Itprovides a team development environment which is easy for modules' integration,coordinations and communications between members. Security is posed on thedistributed environment, so that each group member can only access thoseprograms authorized. Since PM-KGB keeps the complete history records of theproject development process, hence the group leader can retrieve any version ofparticular time of programs at any time. Through system, the group leader cancheck the progressing statistical graphs of each member, to make sure thatproject is going smoothly. This paper will focus on the project progress control and managementsubsystem of PM-KGB. We shall give a detailed discussion in recording thehistory of the progress of source codes and restoring particular version ofsource codes. With PM-KGB system, a project leader can get the various reportsregarding members' developing productivity and quality automatically. Thisreport contains the progressing of source codes. When the project have beendeveloped for a long period of time, the log generated by PM-KGB will looks likea work diary with many volumes. The leader can ask the system to restore anyparticular times' source code and complete report of every version if necessary. Yuh-Huei Shyu 徐郁輝 1996 學位論文 ; thesis 59 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 淡江大學 === 資訊工程學系 === 84 === In academic, industrial and business worlds, hundred of thousands of projectsare undergoing day and night. A project leader may manage one or many projects.A large project funding institute may have thousands of projects to be managedat the same time. It is a quite complicated and messy job to even manage aproject. In order to attack the problems mentioned above, we are developing a projectmanaging environment under UNIX system, which is also named PM-KGB system. Itprovides a team development environment which is easy for modules' integration,coordinations and communications between members. Security is posed on thedistributed environment, so that each group member can only access thoseprograms authorized. Since PM-KGB keeps the complete history records of theproject development process, hence the group leader can retrieve any version ofparticular time of programs at any time. Through system, the group leader cancheck the progressing statistical graphs of each member, to make sure thatproject is going smoothly. This paper will focus on the project progress control and managementsubsystem of PM-KGB. We shall give a detailed discussion in recording thehistory of the progress of source codes and restoring particular version ofsource codes. With PM-KGB system, a project leader can get the various reportsregarding members' developing productivity and quality automatically. Thisreport contains the progressing of source codes. When the project have beendeveloped for a long period of time, the log generated by PM-KGB will looks likea work diary with many volumes. The leader can ask the system to restore anyparticular times' source code and complete report of every version if necessary.
author2 Yuh-Huei Shyu
author_facet Yuh-Huei Shyu
Wu, Chung-Hao
吳忠豪
author Wu, Chung-Hao
吳忠豪
spellingShingle Wu, Chung-Hao
吳忠豪
PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem
author_sort Wu, Chung-Hao
title PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem
title_short PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem
title_full PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem
title_fullStr PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem
title_full_unstemmed PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem
title_sort pm-kgb: a project managing environment - the design of the progress control and managing subsystem
publishDate 1996
url http://ndltd.ncl.edu.tw/handle/13476103246305606197
work_keys_str_mv AT wuchunghao pmkgbaprojectmanagingenvironmentthedesignoftheprogresscontrolandmanagingsubsystem
AT wúzhōngháo pmkgbaprojectmanagingenvironmentthedesignoftheprogresscontrolandmanagingsubsystem
AT wuchunghao yánjiūjìhuàguǎnlǐhuánjìngjìndùkòngzhìyǔguǎnlǐzixìtǒng
AT wúzhōngháo yánjiūjìhuàguǎnlǐhuánjìngjìndùkòngzhìyǔguǎnlǐzixìtǒng
_version_ 1717785158313050112