PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem
碩士 === 淡江大學 === 資訊工程學系 === 84 === In academic, industrial and business worlds, hundred of thousands of projectsare undergoing day and night. A project leader may manage one or many projects.A large project funding institute may have tho...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1996
|
Online Access: | http://ndltd.ncl.edu.tw/handle/13476103246305606197 |
id |
ndltd-TW-084TKU00392024 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-084TKU003920242015-10-13T17:49:30Z http://ndltd.ncl.edu.tw/handle/13476103246305606197 PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem 研究計畫管理環境-進度控制與管理子系統 Wu, Chung-Hao 吳忠豪 碩士 淡江大學 資訊工程學系 84 In academic, industrial and business worlds, hundred of thousands of projectsare undergoing day and night. A project leader may manage one or many projects.A large project funding institute may have thousands of projects to be managedat the same time. It is a quite complicated and messy job to even manage aproject. In order to attack the problems mentioned above, we are developing a projectmanaging environment under UNIX system, which is also named PM-KGB system. Itprovides a team development environment which is easy for modules' integration,coordinations and communications between members. Security is posed on thedistributed environment, so that each group member can only access thoseprograms authorized. Since PM-KGB keeps the complete history records of theproject development process, hence the group leader can retrieve any version ofparticular time of programs at any time. Through system, the group leader cancheck the progressing statistical graphs of each member, to make sure thatproject is going smoothly. This paper will focus on the project progress control and managementsubsystem of PM-KGB. We shall give a detailed discussion in recording thehistory of the progress of source codes and restoring particular version ofsource codes. With PM-KGB system, a project leader can get the various reportsregarding members' developing productivity and quality automatically. Thisreport contains the progressing of source codes. When the project have beendeveloped for a long period of time, the log generated by PM-KGB will looks likea work diary with many volumes. The leader can ask the system to restore anyparticular times' source code and complete report of every version if necessary. Yuh-Huei Shyu 徐郁輝 1996 學位論文 ; thesis 59 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 淡江大學 === 資訊工程學系 === 84 === In academic, industrial and business worlds, hundred of
thousands of projectsare undergoing day and night. A project
leader may manage one or many projects.A large project funding
institute may have thousands of projects to be managedat the
same time. It is a quite complicated and messy job to even
manage aproject. In order to attack the problems mentioned
above, we are developing a projectmanaging environment under
UNIX system, which is also named PM-KGB system. Itprovides a
team development environment which is easy for modules'
integration,coordinations and communications between members.
Security is posed on thedistributed environment, so that each
group member can only access thoseprograms authorized. Since
PM-KGB keeps the complete history records of theproject
development process, hence the group leader can retrieve any
version ofparticular time of programs at any time. Through
system, the group leader cancheck the progressing statistical
graphs of each member, to make sure thatproject is going
smoothly. This paper will focus on the project progress
control and managementsubsystem of PM-KGB. We shall give a
detailed discussion in recording thehistory of the progress of
source codes and restoring particular version ofsource codes.
With PM-KGB system, a project leader can get the various
reportsregarding members' developing productivity and quality
automatically. Thisreport contains the progressing of source
codes. When the project have beendeveloped for a long period of
time, the log generated by PM-KGB will looks likea work diary
with many volumes. The leader can ask the system to restore
anyparticular times' source code and complete report of every
version if necessary.
|
author2 |
Yuh-Huei Shyu |
author_facet |
Yuh-Huei Shyu Wu, Chung-Hao 吳忠豪 |
author |
Wu, Chung-Hao 吳忠豪 |
spellingShingle |
Wu, Chung-Hao 吳忠豪 PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem |
author_sort |
Wu, Chung-Hao |
title |
PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem |
title_short |
PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem |
title_full |
PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem |
title_fullStr |
PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem |
title_full_unstemmed |
PM-KGB: A Project Managing Environment - The Design of the Progress Control and Managing Subsystem |
title_sort |
pm-kgb: a project managing environment - the design of the progress control and managing subsystem |
publishDate |
1996 |
url |
http://ndltd.ncl.edu.tw/handle/13476103246305606197 |
work_keys_str_mv |
AT wuchunghao pmkgbaprojectmanagingenvironmentthedesignoftheprogresscontrolandmanagingsubsystem AT wúzhōngháo pmkgbaprojectmanagingenvironmentthedesignoftheprogresscontrolandmanagingsubsystem AT wuchunghao yánjiūjìhuàguǎnlǐhuánjìngjìndùkòngzhìyǔguǎnlǐzixìtǒng AT wúzhōngháo yánjiūjìhuàguǎnlǐhuánjìngjìndùkòngzhìyǔguǎnlǐzixìtǒng |
_version_ |
1717785158313050112 |