Tw0-stage multi-family flowshop scheduling problems with batching operations

博士 === 國立清華大學 === 工業工程與工程管理學系 === 88 === Scheduling began to be taken seriously in manufacturing at beginning of this century. Most of the real world scheduling problems are difficult to solve and named as NP-hard. This topic is concerned with allocating limited resources to optimize the objective...

Full description

Bibliographic Details
Main Authors: Jung-Te Wang, 王榮德
Other Authors: Maw-Sheng Chern
Format: Others
Language:zh-TW
Published: 1999
Online Access:http://ndltd.ncl.edu.tw/handle/64972239655169098353

Similar Items