Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy

碩士 === 國立交通大學 === 工業工程與管理系所 === 92 === In general, wafer fabrication factories mostly define the photolithography area as the dispatching center of the whole factory. To establish a set of operative dispatching rule in the photolithography area and considering the rework of defective products would...

Full description

Bibliographic Details
Main Author: 陳慶宏
Other Authors: 沙永傑
Format: Others
Language:zh-TW
Published: 2004
Online Access:http://ndltd.ncl.edu.tw/handle/21015337800899983646
id ndltd-TW-092NCTU5031013
record_format oai_dc
spelling ndltd-TW-092NCTU50310132015-10-13T13:04:21Z http://ndltd.ncl.edu.tw/handle/21015337800899983646 Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy 考慮線上重工之瓶頸機台派工法則構建 陳慶宏 碩士 國立交通大學 工業工程與管理系所 92 In general, wafer fabrication factories mostly define the photolithography area as the dispatching center of the whole factory. To establish a set of operative dispatching rule in the photolithography area and considering the rework of defective products would be contributive to coordinate and balance the workload in the whole production line. Furthermore, it would help to enhance the productivity and efficiency of wafer fabrication, reduce the stock of on-line WIP and shorten the production cycle time, and satisfy the requirements of customers about the production due time and the product quality. This research uses on-line rework as the basis to bring the rework of batch process factor into the dispatching rule for measurement, then develops the dispatching rule which includes the rework strategy. Besides, this research focuses on the high finished proportion of batch in the photolithography area in order to finish the manufacturing procedure faster, lighten the machine workload of the waiting line, and finally increase the quantity of output. 沙永傑 2004 學位論文 ; thesis 78 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工業工程與管理系所 === 92 === In general, wafer fabrication factories mostly define the photolithography area as the dispatching center of the whole factory. To establish a set of operative dispatching rule in the photolithography area and considering the rework of defective products would be contributive to coordinate and balance the workload in the whole production line. Furthermore, it would help to enhance the productivity and efficiency of wafer fabrication, reduce the stock of on-line WIP and shorten the production cycle time, and satisfy the requirements of customers about the production due time and the product quality. This research uses on-line rework as the basis to bring the rework of batch process factor into the dispatching rule for measurement, then develops the dispatching rule which includes the rework strategy. Besides, this research focuses on the high finished proportion of batch in the photolithography area in order to finish the manufacturing procedure faster, lighten the machine workload of the waiting line, and finally increase the quantity of output.
author2 沙永傑
author_facet 沙永傑
陳慶宏
author 陳慶宏
spellingShingle 陳慶宏
Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy
author_sort 陳慶宏
title Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy
title_short Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy
title_full Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy
title_fullStr Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy
title_full_unstemmed Construction of Dispatching Rule of Bottleneck Workstation under Considering on-Line Rework Strategy
title_sort construction of dispatching rule of bottleneck workstation under considering on-line rework strategy
publishDate 2004
url http://ndltd.ncl.edu.tw/handle/21015337800899983646
work_keys_str_mv AT chénqìnghóng constructionofdispatchingruleofbottleneckworkstationunderconsideringonlinereworkstrategy
AT chénqìnghóng kǎolǜxiànshàngzhònggōngzhīpíngjǐngjītáipàigōngfǎzégòujiàn
_version_ 1717729635409592320