A Critical Chain based Heuristic Model for Multiple Projects Scheduling
碩士 === 淡江大學 === 資訊管理學系 === 92 === According to the study of Standish Group from 13,522 IT projects in 2003, 82% IT projects are time overruns. This study shows the IT project has serious problems in time management. We developed Multiple Projects Critical Chain Scheduling Model (MPCCSM) which avoids...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/27724937715837483692 |
id |
ndltd-TW-092TKU00396023 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-092TKU003960232016-06-15T04:16:53Z http://ndltd.ncl.edu.tw/handle/27724937715837483692 A Critical Chain based Heuristic Model for Multiple Projects Scheduling 以關鍵鏈為基礎多重專案排程之啟發式模型 Vincent Lin 林宏澤 碩士 淡江大學 資訊管理學系 92 According to the study of Standish Group from 13,522 IT projects in 2003, 82% IT projects are time overruns. This study shows the IT project has serious problems in time management. We developed Multiple Projects Critical Chain Scheduling Model (MPCCSM) which avoids resource conflicting. In a single project scheduling, MPCCSM takes activities using as many slacks as possible and inserts capacity constraint buffer (CCR) to avoid resource conflicting in multiple projects. When a project is added to current planning, MPCCSM allows single project to use as much float time as possible under the condition that does not increase the total work through time of current project planning and makes new project start as early as possible. This research conducted PROGEN to generate simulation data for the evaluation of our proposed model. Nine groups of simulation data are created. The results show that MPCCSM completely avoids the problem of resource conflicting. Compared with a well known commercial Critical Chain based project management software — Scitor PS8.5, the MPCCSM significantly reduces total work through time, increases resource utility rate and reduces multiple projects mean flow time. Huan-Jyh Shyur 徐煥智 2004 學位論文 ; thesis 66 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 淡江大學 === 資訊管理學系 === 92 === According to the study of Standish Group from 13,522 IT projects in 2003, 82% IT projects are time overruns. This study shows the IT project has serious problems in time management. We developed Multiple Projects Critical Chain Scheduling Model (MPCCSM) which avoids resource conflicting. In a single project scheduling, MPCCSM takes activities using as many slacks as possible and inserts capacity constraint buffer (CCR) to avoid resource conflicting in multiple projects. When a project is added to current planning, MPCCSM allows single project to use as much float time as possible under the condition that does not increase the total work through time of current project planning and makes new project start as early as possible.
This research conducted PROGEN to generate simulation data for the evaluation of our proposed model. Nine groups of simulation data are created. The results show that MPCCSM completely avoids the problem of resource conflicting. Compared with a well known commercial Critical Chain based project management software — Scitor PS8.5, the MPCCSM significantly reduces total work through time, increases resource utility rate and reduces multiple projects mean flow time.
|
author2 |
Huan-Jyh Shyur |
author_facet |
Huan-Jyh Shyur Vincent Lin 林宏澤 |
author |
Vincent Lin 林宏澤 |
spellingShingle |
Vincent Lin 林宏澤 A Critical Chain based Heuristic Model for Multiple Projects Scheduling |
author_sort |
Vincent Lin |
title |
A Critical Chain based Heuristic Model for Multiple Projects Scheduling |
title_short |
A Critical Chain based Heuristic Model for Multiple Projects Scheduling |
title_full |
A Critical Chain based Heuristic Model for Multiple Projects Scheduling |
title_fullStr |
A Critical Chain based Heuristic Model for Multiple Projects Scheduling |
title_full_unstemmed |
A Critical Chain based Heuristic Model for Multiple Projects Scheduling |
title_sort |
critical chain based heuristic model for multiple projects scheduling |
publishDate |
2004 |
url |
http://ndltd.ncl.edu.tw/handle/27724937715837483692 |
work_keys_str_mv |
AT vincentlin acriticalchainbasedheuristicmodelformultipleprojectsscheduling AT línhóngzé acriticalchainbasedheuristicmodelformultipleprojectsscheduling AT vincentlin yǐguānjiànliànwèijīchǔduōzhòngzhuānànpáichéngzhīqǐfāshìmóxíng AT línhóngzé yǐguānjiànliànwèijīchǔduōzhòngzhuānànpáichéngzhīqǐfāshìmóxíng AT vincentlin criticalchainbasedheuristicmodelformultipleprojectsscheduling AT línhóngzé criticalchainbasedheuristicmodelformultipleprojectsscheduling |
_version_ |
1718304759914430464 |