Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing
碩士 === 淡江大學 === 企業管理學系碩士在職專班 === 94 === The success of government IT outsourcing is not only the indicator of e-government’s satisfaction for public, but also a huge influence for the development of IT industry. This study intends to discuss the current status of IV&V introduction and implement...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/33698469284248346754 |
id |
ndltd-TW-094TKU05121038 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-094TKU051210382016-05-30T04:21:31Z http://ndltd.ncl.edu.tw/handle/33698469284248346754 Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing 政府資訊委外案導入獨立驗證與確認(IV&V)機制的關鍵因素探討 Mei-Hua Chu 朱美華 碩士 淡江大學 企業管理學系碩士在職專班 94 The success of government IT outsourcing is not only the indicator of e-government’s satisfaction for public, but also a huge influence for the development of IT industry. This study intends to discuss the current status of IV&V introduction and implementation in government IT outsourcing, and try to find out the key factors for the three main different bidding classifies. According to literature review, a hypothesis is built for the research, conclusion through questionnaire research and analysis are indicated as follow. The key factors influencing the introduction of IV&V for Consultancy Bidding Project are vendor’s experience, user’s requirement, schedule controlling ability, IV&V recognition and etc.. There are five main factors such as management ability, vendor’s reputation, IV&V recognition, and risk prediction ability for Planning Projects. Collaborated functionality, user’s requirement, supporting ability and other five elements are critical for Construction Projects. In current status of government IT outsourcing, this research result shows most interviewees understand the aim and detail of IV&V, 68.5% satisfied the result after using IV&V implementation, but there is less than 50% accept the service of IV&V vendor’s coordination. In addition, there’s no correlation between project price and its performance with IV&V implementation. For different types of bidding project, the various distinct correlations are also indicated among the influencing segments and project performance elements. Chu-Ching Wang Li-Ren Yang 王居卿 楊立人 2006 學位論文 ; thesis 72 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 淡江大學 === 企業管理學系碩士在職專班 === 94 === The success of government IT outsourcing is not only the indicator of e-government’s satisfaction for public, but also a huge influence for the development of IT industry. This study intends to discuss the current status of IV&V introduction and implementation in government IT outsourcing, and try to find out the key factors for the three main different bidding classifies. According to literature review, a hypothesis is built for the research, conclusion through questionnaire research and analysis are indicated as follow.
The key factors influencing the introduction of IV&V for Consultancy Bidding Project are vendor’s experience, user’s requirement, schedule controlling ability, IV&V recognition and etc.. There are five main factors such as management ability, vendor’s reputation, IV&V recognition, and risk prediction ability for Planning Projects. Collaborated functionality, user’s requirement, supporting ability and other five elements are critical for Construction Projects.
In current status of government IT outsourcing, this research result shows most interviewees understand the aim and detail of IV&V, 68.5% satisfied the result after using IV&V implementation, but there is less than 50% accept the service of IV&V vendor’s coordination. In addition, there’s no correlation between project price and its performance with IV&V implementation. For different types of bidding project, the various distinct correlations are also indicated among the influencing segments and project performance elements.
|
author2 |
Chu-Ching Wang |
author_facet |
Chu-Ching Wang Mei-Hua Chu 朱美華 |
author |
Mei-Hua Chu 朱美華 |
spellingShingle |
Mei-Hua Chu 朱美華 Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing |
author_sort |
Mei-Hua Chu |
title |
Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing |
title_short |
Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing |
title_full |
Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing |
title_fullStr |
Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing |
title_full_unstemmed |
Key Factors Influencing the Introduction of IV&V in Government IT Outsourcing |
title_sort |
key factors influencing the introduction of iv&v in government it outsourcing |
publishDate |
2006 |
url |
http://ndltd.ncl.edu.tw/handle/33698469284248346754 |
work_keys_str_mv |
AT meihuachu keyfactorsinfluencingtheintroductionofivvingovernmentitoutsourcing AT zhūměihuá keyfactorsinfluencingtheintroductionofivvingovernmentitoutsourcing AT meihuachu zhèngfǔzīxùnwěiwàiàndǎorùdúlìyànzhèngyǔquèrènivvjīzhìdeguānjiànyīnsùtàntǎo AT zhūměihuá zhèngfǔzīxùnwěiwàiàndǎorùdúlìyànzhèngyǔquèrènivvjīzhìdeguānjiànyīnsùtàntǎo |
_version_ |
1718285198848688128 |