A Flexible Scheduling Model for the Unrelated Parallel Machines Production System
碩士 === 中原大學 === 工業工程研究所 === 95 === This research considers the scheduling problem about unrelated parallel machines with machine eligibility and sequence-dependent setup times. In practice, due to there are different importance ratings, sequence-dependent setup times and machine eligibility among or...
Main Authors: | CHIU-MEI HUANG, 黃秋媚 |
---|---|
Other Authors: | Jai-Chin Jiang |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/36587575729997007549 |
Similar Items
-
Unrelated Parallel Machine Scheduling
by: HanJai Huang, et al.
Published: (1999) -
Scheduling Independent Jobs on Unrelated Parallel Machines
by: Yang, Jui-Ling, et al.
Published: (1996) -
A Flow Shop Scheduling Problem with Resource Flexibility and Unrelated Parallel-Machine Consideration
by: Chen-wei Liu, et al.
Published: (2012) -
A Study of the Scheduling and Dispatching on Unrelated Parallel Machines
by: Jin-Yuan Chen, et al.
Published: (2003) -
A hybrid algorithm for unrelated parallel machines scheduling
by: Mohsen Shafiei Nikabadi, et al.
Published: (2016-09-01)