Engineering Project Risk Management System Analysis and Planning – An Example Applied in the Project of High-Speed Railway
碩士 === 國立高雄應用科技大學 === 工業工程與管理系碩士班 === 96 === The progresses and cost of engineering projects are often influenced by uncertain factors. After identified these factors, most of them can all be listed and prevented via analysis. Relevant literatures in the field were rarely found. Therefore, this rese...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/72419137348613902175 |