Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming
博士 === 雲林科技大學 === 工程科技研究所博士班 === 96 === This research develops a cash flow-based scheduling optimization model for construction projects using constraint programming (CP), and provides contractors to perform financial inspection. Due to different characteristics of scheduling problems, the model fo...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/84552779573339642357 |
id |
ndltd-TW-096YUNT5028014 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096YUNT50280142015-10-13T11:20:44Z http://ndltd.ncl.edu.tw/handle/84552779573339642357 Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming 應用限制規劃建構營建專案排程最佳化模式-以專案現金流量為基礎 Chang-Jung Wang 王滄榮 博士 雲林科技大學 工程科技研究所博士班 96 This research develops a cash flow-based scheduling optimization model for construction projects using constraint programming (CP), and provides contractors to perform financial inspection. Due to different characteristics of scheduling problems, the model formulation is divided into two parts: (1) model formulation to resource-constrained project scheduling problem (RCPSP); (2) model formulation to linear scheduling problem. The former describes the model formulation to handle project scheduling problems, which are in a resource-constrained environment and called RCPSP. The later considers issues of work continuity and interruption time of linear construction project for scheduling optimization. Moreover, in order to assess the financial health of a construction project, cash flow and related considerations, such as interest rate, payment condition and credit limit, are engaged into the both formulation Due to the flexibility of CP, several scenarios with various requirements are conducted and discussed for practice purposes, and are modified without rebuilding the model formulation. Consequently, this study provides contractors a scheduling optimization model, which combines cash flow, to assist contractors in arranging activities complying with the nature of construction projects, and moreover financial elements are integrated to benefit the evaluation of project financing and performance. Shu-Shun Liu 劉述舜 2008 學位論文 ; thesis 116 en_US |
collection |
NDLTD |
language |
en_US |
format |
Others
|
sources |
NDLTD |
description |
博士 === 雲林科技大學 === 工程科技研究所博士班 === 96 === This research develops a cash flow-based scheduling optimization model for construction projects using constraint programming (CP), and provides contractors to perform financial inspection. Due to different characteristics of scheduling problems, the model formulation is divided into two parts: (1) model formulation to resource-constrained project scheduling problem (RCPSP); (2) model formulation to linear scheduling problem. The former describes the model formulation to handle project scheduling problems, which are in a resource-constrained environment and called RCPSP. The later considers issues of work continuity and interruption time of linear construction project for scheduling optimization. Moreover, in order to assess the financial health of a construction project, cash flow and related considerations, such as interest rate, payment condition and credit limit, are engaged into the both formulation Due to the flexibility of CP, several scenarios with various requirements are conducted and discussed for practice purposes, and are modified without rebuilding the model formulation. Consequently, this study provides contractors a scheduling optimization model, which combines cash flow, to assist contractors in arranging activities complying with the nature of construction projects, and moreover financial elements are integrated to benefit the evaluation of project financing and performance.
|
author2 |
Shu-Shun Liu |
author_facet |
Shu-Shun Liu Chang-Jung Wang 王滄榮 |
author |
Chang-Jung Wang 王滄榮 |
spellingShingle |
Chang-Jung Wang 王滄榮 Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming |
author_sort |
Chang-Jung Wang |
title |
Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming |
title_short |
Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming |
title_full |
Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming |
title_fullStr |
Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming |
title_full_unstemmed |
Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming |
title_sort |
cash flow-based scheduling optimization model for construction projects using constraint programming |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/84552779573339642357 |
work_keys_str_mv |
AT changjungwang cashflowbasedschedulingoptimizationmodelforconstructionprojectsusingconstraintprogramming AT wángcāngróng cashflowbasedschedulingoptimizationmodelforconstructionprojectsusingconstraintprogramming AT changjungwang yīngyòngxiànzhìguīhuàjiàngòuyíngjiànzhuānànpáichéngzuìjiāhuàmóshìyǐzhuānànxiànjīnliúliàngwèijīchǔ AT wángcāngróng yīngyòngxiànzhìguīhuàjiàngòuyíngjiànzhuānànpáichéngzuìjiāhuàmóshìyǐzhuānànxiànjīnliúliàngwèijīchǔ |
_version_ |
1716842242764701696 |