A review of wafer fab scheduling approaches-dispatching policies

碩士 === 逢甲大學 === 工業工程與系統管理學研究所 === 97 === Job scheduling is critical to the production control of a manufacturing system. A wafer fabrication factory is a very complicated manufacturing system with characteristics such as: fluctuating demand, jobs with various product types and priorities, un-balance...

Full description

Bibliographic Details
Main Authors: Ming-Chun Wu, 吳明峻
Other Authors: Tin-Chih Chen
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/32400689815867674590
id ndltd-TW-097FCU05031038
record_format oai_dc
spelling ndltd-TW-097FCU050310382015-11-13T04:09:17Z http://ndltd.ncl.edu.tw/handle/32400689815867674590 A review of wafer fab scheduling approaches-dispatching policies 晶圓廠生產排程方法的探討-派工法則 Ming-Chun Wu 吳明峻 碩士 逢甲大學 工業工程與系統管理學研究所 97 Job scheduling is critical to the production control of a manufacturing system. A wafer fabrication factory is a very complicated manufacturing system with characteristics such as: fluctuating demand, jobs with various product types and priorities, un-balanced capacity, reentry of jobs into machines, alternative machines with unequal capacity, and shifting bottlenecks that make job scheduling jobs scheduling in a wafer fabrication a very difficult task. Many studies have shown that applying the general scheduling rules(such as first-in first out (FIFO), earliest due date (EDD), least slack (LS), shortest processing time (SPT), shortest remaining processing time (SRPT), critical ratio (CR) FIFO+, SRPT+, and SRPT++) to a semiconductor manufacturing factory did not lead to very satisfactory results. Nevertheless, the research focusing on scheduling a semiconductor manufacturing factory has become a very important issue at present. A review on the state-of-the-art scheduling approaches for wafer fabrication factory control is presented in this study. Tin-Chih Chen 陳亭志 2009 學位論文 ; thesis 45 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 工業工程與系統管理學研究所 === 97 === Job scheduling is critical to the production control of a manufacturing system. A wafer fabrication factory is a very complicated manufacturing system with characteristics such as: fluctuating demand, jobs with various product types and priorities, un-balanced capacity, reentry of jobs into machines, alternative machines with unequal capacity, and shifting bottlenecks that make job scheduling jobs scheduling in a wafer fabrication a very difficult task. Many studies have shown that applying the general scheduling rules(such as first-in first out (FIFO), earliest due date (EDD), least slack (LS), shortest processing time (SPT), shortest remaining processing time (SRPT), critical ratio (CR) FIFO+, SRPT+, and SRPT++) to a semiconductor manufacturing factory did not lead to very satisfactory results. Nevertheless, the research focusing on scheduling a semiconductor manufacturing factory has become a very important issue at present. A review on the state-of-the-art scheduling approaches for wafer fabrication factory control is presented in this study.
author2 Tin-Chih Chen
author_facet Tin-Chih Chen
Ming-Chun Wu
吳明峻
author Ming-Chun Wu
吳明峻
spellingShingle Ming-Chun Wu
吳明峻
A review of wafer fab scheduling approaches-dispatching policies
author_sort Ming-Chun Wu
title A review of wafer fab scheduling approaches-dispatching policies
title_short A review of wafer fab scheduling approaches-dispatching policies
title_full A review of wafer fab scheduling approaches-dispatching policies
title_fullStr A review of wafer fab scheduling approaches-dispatching policies
title_full_unstemmed A review of wafer fab scheduling approaches-dispatching policies
title_sort review of wafer fab scheduling approaches-dispatching policies
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/32400689815867674590
work_keys_str_mv AT mingchunwu areviewofwaferfabschedulingapproachesdispatchingpolicies
AT wúmíngjùn areviewofwaferfabschedulingapproachesdispatchingpolicies
AT mingchunwu jīngyuánchǎngshēngchǎnpáichéngfāngfǎdetàntǎopàigōngfǎzé
AT wúmíngjùn jīngyuánchǎngshēngchǎnpáichéngfāngfǎdetàntǎopàigōngfǎzé
AT mingchunwu reviewofwaferfabschedulingapproachesdispatchingpolicies
AT wúmíngjùn reviewofwaferfabschedulingapproachesdispatchingpolicies
_version_ 1718129528876826624