The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering

碩士 === 正修科技大學 === 電機工程研究所 === 100 === The thesis proposes an effective project management (PM)to integrate the different work items in building construction. The application of PM can complete all the work item of construction in the same area within a limited duration. The work scope and its execut...

Full description

Bibliographic Details
Main Authors: Jhih-Hung Jhang Jian, 張簡智宏
Other Authors: Kun-Yuan Huang
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/57996558749189943030
id ndltd-TW-100CSU00999003
record_format oai_dc
spelling ndltd-TW-100CSU009990032015-10-13T20:47:26Z http://ndltd.ncl.edu.tw/handle/57996558749189943030 The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering 建物工程專案管理之工作分解結構及時程管理整合研究 Jhih-Hung Jhang Jian 張簡智宏 碩士 正修科技大學 電機工程研究所 100 The thesis proposes an effective project management (PM)to integrate the different work items in building construction. The application of PM can complete all the work item of construction in the same area within a limited duration. The work scope and its executive duration are integrated into the PM plan which is distributed to the members. Therefore, every PM member, no metter when he joins this project organizstion, clearly knows his own duty and when the duty needs to be finished. The interface between the different construction item can be handled efficiently by using work breakdown structure (WBS)and time management. The PM members will also know the related construction interface so they can prepare the associated meterial. Furthermore, the sofeware of Microsofe Project and critical path method (CPM)are used in the study to arrange the construction items. The interior decorated work can be incorporated into the Grant chart to promote the work efficiency. Kun-Yuan Huang 黃坤元 2012 學位論文 ; thesis 142 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 正修科技大學 === 電機工程研究所 === 100 === The thesis proposes an effective project management (PM)to integrate the different work items in building construction. The application of PM can complete all the work item of construction in the same area within a limited duration. The work scope and its executive duration are integrated into the PM plan which is distributed to the members. Therefore, every PM member, no metter when he joins this project organizstion, clearly knows his own duty and when the duty needs to be finished. The interface between the different construction item can be handled efficiently by using work breakdown structure (WBS)and time management. The PM members will also know the related construction interface so they can prepare the associated meterial. Furthermore, the sofeware of Microsofe Project and critical path method (CPM)are used in the study to arrange the construction items. The interior decorated work can be incorporated into the Grant chart to promote the work efficiency.
author2 Kun-Yuan Huang
author_facet Kun-Yuan Huang
Jhih-Hung Jhang Jian
張簡智宏
author Jhih-Hung Jhang Jian
張簡智宏
spellingShingle Jhih-Hung Jhang Jian
張簡智宏
The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering
author_sort Jhih-Hung Jhang Jian
title The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering
title_short The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering
title_full The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering
title_fullStr The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering
title_full_unstemmed The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering
title_sort integration study of work breakdown structure and time management in project management for building construction engineering
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/57996558749189943030
work_keys_str_mv AT jhihhungjhangjian theintegrationstudyofworkbreakdownstructureandtimemanagementinprojectmanagementforbuildingconstructionengineering
AT zhāngjiǎnzhìhóng theintegrationstudyofworkbreakdownstructureandtimemanagementinprojectmanagementforbuildingconstructionengineering
AT jhihhungjhangjian jiànwùgōngchéngzhuānànguǎnlǐzhīgōngzuòfēnjiějiégòujíshíchéngguǎnlǐzhěnghéyánjiū
AT zhāngjiǎnzhìhóng jiànwùgōngchéngzhuānànguǎnlǐzhīgōngzuòfēnjiějiégòujíshíchéngguǎnlǐzhěnghéyánjiū
AT jhihhungjhangjian integrationstudyofworkbreakdownstructureandtimemanagementinprojectmanagementforbuildingconstructionengineering
AT zhāngjiǎnzhìhóng integrationstudyofworkbreakdownstructureandtimemanagementinprojectmanagementforbuildingconstructionengineering
_version_ 1718051215461318656