Reworking Scheduling for a Flowshop Manufacturing Cell with Sequence-dependent Family Setup Times
碩士 === 國立臺北科技大學 === 工業工程與管理系碩士班 === 100 === This thesis examined the flowshop manufacturing cell reworking scheduling problem (FMCRSP) with sequence-dependent family setup times. The present study is among the first to investigate flowshop manufacturing cell scheduling problem with reworking conside...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/24ffsg |