Building the Control Systems of RELAP5-3D Input Deck of KuoSheng Nuclear Power Station

碩士 === 國立清華大學 === 核子工程與科學研究所 === 104 === Abstract In the present study, the control system of RELAP5-3D input deck of Kuosheng Nuclear Power station is constructed. The plant employs a BWR6 (Boiling Water Reactor) reactor with Mark III containment and is operated by Taiwan Power Company. The rate...

Full description

Bibliographic Details
Main Authors: Fu, Yu-Feng, 傅宇烽
Other Authors: Lee, Min
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/79221827744417434527