A Coping Strategy of Power Supply Bottlenecks For Taiyuan Secondary Substation

碩士 === 國立高雄應用科技大學 === 電機工程系博碩士班 === 106 === Taiyuan Secondary Substation belongs to "Jiadung Fangliao Service Area" of Taipower. This substation has an installed capacity of 125MVA (Taiyuan S/S 25 MVA x 3, Fangliao S/S 25 MVA x 2). In 2015, its maximum load was 81.6MVA, reaching a...

Full description

Bibliographic Details
Main Authors: I-Shun Ku, 辜亦順
Other Authors: CHO,MING-YUAN
Format: Others
Language:zh-TW
Published: 2018
Online Access:http://ndltd.ncl.edu.tw/handle/xw2v4e