Hybrid Flow Shop Scheduling with Unrelated Parallel Machines and Sequence-dependent Setup Time
碩士 === 國立臺灣大學 === 工業工程學研究所 === 106 === In this paper, we study a two-stage hybrid flow shop scheduling problem where unrelated parallel machines and sequence-dependent setup time are considered.We propose two algorithms based on the characteristics of the production line.Under the same parameter set...
Main Authors: | Shao-Hao Chang, 張少豪 |
---|---|
Other Authors: | 洪一薫 |
Format: | Others |
Language: | zh-TW |
Published: |
2018
|
Online Access: | http://ndltd.ncl.edu.tw/handle/v6qsvx |
Similar Items
-
Scheduling on unrelated parallel machines with sequence dependent setup times
by: Guilherme Etcheverry, et al.
Published: (2014-08-01) -
Hybrid Meta-Heuristics for the Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times
by: Huang, Wen Pin, et al.
Published: (2008) -
Unrelated parallel machine scheduling problem with sequence dependent setup times
by: Pei Hsuan Lin, et al.
Published: (2013) -
Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times.
by: Absalom E Ezugwu, et al.
Published: (2018-01-01) -
An Improved Firefly Algorithm for the Unrelated Parallel Machines Scheduling Problem With Sequence-Dependent Setup Times
by: Absalom E. Ezugwu, et al.
Published: (2018-01-01)