Extended stormwater detention basin design for pollutant removal

A Statistical formulation for estimating the average time of detention within a pond for a captured runoff volume is presented. It is assumed that mixing takes place during an event and that settling occurs over the period required to empty the captured volume or the time between successive events,...

Full description

Bibliographic Details
Main Author: Watkins, Edwin W.
Other Authors: Civil Engineering
Format: Others
Language:en
Published: Virginia Tech 2014
Subjects:
Online Access:http://hdl.handle.net/10919/44177
http://scholar.lib.vt.edu/theses/available/etd-08042009-040522/