Weekly Two-Stage Robust Generation Scheduling for Hydrothermal Power Systems
As compared to short-term forecasting (e.g., 1 day), it is often challenging to accurately forecast the volume of precipitation in a medium-term horizon (e.g., 1 week). As a result, fluctuations in water inflow can trigger generation shortage and electricity price spikes in a power system with major...
Main Authors: | , , , |
---|---|
Other Authors: | |
Language: | en |
Published: |
IEEE-INST ELECTRICAL ELECTRONICS ENGINEERS INC
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/622668 http://arizona.openrepository.com/arizona/handle/10150/622668 |