Showing 1 - 18 results of 18 for search 'COST ACCOUNTING', query time: 0.66s Refine Results
  1. 1
  2. 2
    by Khlissa, Radhouane
    Published 2015
    ... into account a multi-physical modeling. The main interest in this type of optimization method...
    Get full text
  3. 3
    by Bui, Manh-Tuan
    Published 2014
    ... take into account the distortions. However, fitting the training samples to the model, is not the best...
    Get full text
  4. 4
    by Tiar, Mohamed Amine
    Published 2017
    ... the advantage of taking into account the presence of fi bers, long or short and distributed randomly...
    Get full text
  5. 5
    by Rasid, Mohd Azri Hizami
    Published 2016
    ... choice of machine, with the manufacturer cost and manufacturing concern taken en into account...
    Get full text
  6. 6
    by Stan, Oana
    Published 2013
    ... into account uncertain data (e.g. execution time). Our focus is on chance constrained programs...
    Get full text
  7. 7
    by Li, Nan
    Published 2017
    ... is based on a sample, this method takes into account the heterogeneity and complexity of the structure...
    Get full text
  8. 8
    by Yin, Qi
    Published 2016
    ... elements, taking into account uncertain material (elastic moduli, Poisson's ratios, densities...
    Get full text
  9. 9
    by Barus, Lita Sari
    Published 2015
    ... into account. Therefore we propose the "Adapted Mixed Multinomial Logit (AMML)" Model as a tool for analysis...
    Get full text
  10. 10
    by Xia, Liang
    Published 2015
    ... heterogeneities of materials have significant impact on the structural behavior that one needs to account for both...
    Get full text
  11. 11
    by Dang, Weidong
    Published 2015
    ... with acceptable computational cost. As regards solid model, spot welded joint and adhesive bonded joint behaviors...
    Get full text
  12. 12
    by Mercado-Ravell, Diego Alberto
    Published 2015
    ... for the system under consideration, taking into account noisy measurements of the UAV position, velocity...
    Get full text
  13. 13
    by Yakoub, Walid
    Published 2017
    ... commercially available. If the cell density achieved can lead to high yield, the cost of the whole device...
    Get full text
  14. 14
    by Lebon, Jérémy
    Published 2013
    ... which require extensive training sets. We then face two issues: high computational costs...
    Get full text
  15. 15
    by Mahjudin, Mahyunirsyah
    Published 2015
    ... into account uncertainties in structural mechanics is a real challenge and leads to intensive research...
    Get full text
  16. 16
    by Decorato, Iolanda
    Published 2013
    ... understand the hemodynamics within the AVF, when the compliance of the vascularwall is taken into account. We...
    Get full text
  17. 17
    by Pham, Cong Cuong
    Published 2017
    ... costs have led to an exponential increase of volume data within entreprise information system. The large...
    Get full text
  18. 18
    by Phan, Minh Tien
    Published 2016
    ...). Firstly, for the «When» question, the display decision has to take into account the driver’s states...
    Get full text