-
1
-
2by Atalla El-Awady Attia, El-AwadySubjects: “...Project planning and scheduling...”
Published 2013
Get full text
-
3by Llamas Zogbi, Valentina Maria“... cadrés tels que le Plan, Do, Check, Act (PDCA), Define, Measure, Analyse, Improve, Control (DMAIC), ou...”
Published 2017
Get full text
-
4by Jabrouni, Hicham“... Solving), Six sigma ou DMAIC (Define, Measure, Analyze, Improve and Control), 7 step, etc. Les activités...”
Published 2012
Get full text
-
5Simulateur électromagnétique d'erreur VOR par méthodes déterministes : Application aux parcs éoliensby Claudepierre, Ludovic“... leurs performances (multitrajets, masquages... ). Il est alors important de pouvoir quantifier ces...”
Published 2015
Get full text
-
6by Gourbil, Ange“... into the liquid flow rather than generated by boiling. The gas injection flow rate is controlled and measured...”
Published 2017
Get full text
-
7by Sanfins, William“... been performed through post-fault-behaviour characterisation using controlled energy failure tests...”
Published 2017
Get full text