نتائج البحث - Bugarin Dejan
- يعرض 1 - 11 نتائج من 11
-
1
-
2
-
3
-
4
-
5
Opening the ore body 'Čoka Marin-1' below K+535 m حسب Mitić Dejan, Ignjatović Dragan, Tašić Dušan, Bugarin Dejan
الحاوية / القاعدة Mining and Metallurgy Engineering Bor (2016-01-01)احصل على النص الكامل
مقال -
6
-
7
Application of the COMFAR III software package in development a feasibility study of investment on an example of technical-construction stone of the open pit Gelja Ljut حسب Bugarin Dejan, Jelić Ivan, Gomilanović Miljan, Doderović Aleksandar
الحاوية / القاعدة Mining and Metallurgy Engineering Bor (2020-01-01)احصل على النص الكامل
مقال -
8
-
9
-
10
Determination of operating and maintenance costs of transport equipment in the development of exploratory mine workings in a lead and zinc mine حسب Bugarin Dejan, Stojičić Ivan, Svrkota Igor, Gomilanović Miljan, Stojanović Miloš
الحاوية / القاعدة Mining and Metallurgy Engineering Bor (2025-01-01)احصل على النص الكامل
مقال -
11
Technical-economic analysis of variants of a micro location for the DTO crushing plant of the DTO system and connecting conveyor T1 at the open pit Potrlica, Pljevlja حسب Bugarin Dejan, Stanić Nikola, Gomilanović Miljan, Doderović Aleksandar, Stanković Tanja
الحاوية / القاعدة Mining and Metallurgy Engineering Bor (2021-01-01)احصل على النص الكامل
مقال
