Genetic Algorithm for Project Scheduling with Logical Relation

In order to solve the problems of model expression and calculation in complex construction projects,this paper conducts a study on the application of three logical relations,including mutual exclusion,coexistence and dependence in the scheduling project expression model.On this basis,a mixed integer...

詳細記述

書誌詳細
出版年:Jisuanji gongcheng
第一著者: LIU Yao, SONG Yuanbin, LI Yunxiang
フォーマット: 論文
言語:英語
出版事項: Editorial Office of Computer Engineering 2020-01-01
主題:
オンライン・アクセス:https://www.ecice06.com/fileup/1000-3428/PDF/20200139.pdf

類似資料