Rudy, J. (2021, September). Parallel Makespan Calculation for Flow Shop Scheduling Problem with Minimal and Maximal Idle Time. Applied Sciences.
Chicago Style (17th ed.) CitationRudy, Jarosław. "Parallel Makespan Calculation for Flow Shop Scheduling Problem with Minimal and Maximal Idle Time." Applied Sciences Sep. 2021.
MLA (9th ed.) CitationRudy, Jarosław. "Parallel Makespan Calculation for Flow Shop Scheduling Problem with Minimal and Maximal Idle Time." Applied Sciences, Sep. 2021.
Warning: These citations may not always be 100% accurate.
