Investigation on stress distribution and prestress loss model of prestressed anchor cables considering corrosion-induced debonding
Corrosion can significantly impact the safety and stability of the entire structure by reducing the service life and load-bearing capacity of anchors. This study provides an in-depth examination of the effects of corrosion on prestressed anchor cables, covering the effects on the anchor cables thems...
| Published in: | Rock Mechanics Bulletin |
|---|---|
| Main Authors: | Hanfang Zheng, Yujing Jiang, Xuezhen Wu, Sunhao Zhang, Satoshi Sugimoto |
| Format: | Article |
| Language: | English |
| Published: |
KeAi Communications Co., Ltd.
2025-04-01
|
| Subjects: | |
| Online Access: | http://www.sciencedirect.com/science/article/pii/S2773230425000162 |
Similar Items
Analysis of Re-Tensioning Time of Anchor Cable Based on New Prestress Loss Model
by: Keyou Shi, et al.
Published: (2021-05-01)
by: Keyou Shi, et al.
Published: (2021-05-01)
A Long-Term Monitoring Method of Corrosion Damage of Prestressed Anchor Cable
by: Jianzhi Li, et al.
Published: (2023-03-01)
by: Jianzhi Li, et al.
Published: (2023-03-01)
A New Prestress Loss Calculation Model of Anchor Cable in Pile–Anchor Structure
by: Xing Gao, et al.
Published: (2022-04-01)
by: Xing Gao, et al.
Published: (2022-04-01)
Study on the Effect of Anchor Cable Prestress Loss on Foundation Stability
by: Tongju Xing, et al.
Published: (2024-06-01)
by: Tongju Xing, et al.
Published: (2024-06-01)
Calculation method for holding prestress of corroded prestressed anchor cable in long-term operation slope
by: Zhao Yang, et al.
Published: (2023-08-01)
by: Zhao Yang, et al.
Published: (2023-08-01)
Analysis method for relaxation effect of prestressed anchor cable tension based on a series rheological model
by: Yi DENG, et al.
Published: (2023-09-01)
by: Yi DENG, et al.
Published: (2023-09-01)
Study on prestress long-term loss of anchor cable considering coupled multiple factors
by: FENG Zhong-ju, et al.
Published: (2021-08-01)
by: FENG Zhong-ju, et al.
Published: (2021-08-01)
The Influence of the Prestressing Level of the Fully Threaded Anchor Bar on the Corrosion Rate
by: Michal Zahuranec, et al.
Published: (2023-06-01)
by: Michal Zahuranec, et al.
Published: (2023-06-01)
Analysis of Multi-Stage Slope Displacement and Internal Force of Supporting Structure of Frame Prestressed Anchor Cable Support
by: Jingbang Li, et al.
Published: (2025-10-01)
by: Jingbang Li, et al.
Published: (2025-10-01)
Application research of a prestressed anchor cable‐pile‐slab wall supporting structure for multistage high fill slopes
by: Yan‐peng Zhu, et al.
Published: (2020-02-01)
by: Yan‐peng Zhu, et al.
Published: (2020-02-01)
Selection of an Optimum Anchoring Method of Composite Rock Stratum Based on Anchor Bolt Support Prestress Field
by: Yiqun Zhou, et al.
Published: (2025-06-01)
by: Yiqun Zhou, et al.
Published: (2025-06-01)
Seismic response investigation of prestressed anchor cable supporting rock slope with weak interlayer in Qinghai-Tibet Plateau, China
by: Yaojiang Fan, et al.
Published: (2024-08-01)
by: Yaojiang Fan, et al.
Published: (2024-08-01)
GMNIA-Based Evaluation of Cable-Prestressed H-Shaped Steel Columns
by: Noureddine Ziane, et al.
Published: (2025-10-01)
by: Noureddine Ziane, et al.
Published: (2025-10-01)
Effect of Prestress Levels and Jacking Methods on Friction Losses in Curved Prestressed Tendons
by: Sungnam Hong
Published: (2017-08-01)
by: Sungnam Hong
Published: (2017-08-01)
Stability Analysis of Filled-Slope Reinforced by Frame with Prestressed Anchor-Plates under Static Action
by: Jun Zhang, et al.
Published: (2023-01-01)
by: Jun Zhang, et al.
Published: (2023-01-01)
An early warning method for a slope based on the increment ratio of anchor cable internal force
by: Jincai Feng, et al.
Published: (2023-04-01)
by: Jincai Feng, et al.
Published: (2023-04-01)
Two-Way Time-Dependent Prestress Losses of Prestressed Concrete Containment with Bonded Prestressing Strands
by: Xingyi Wu, et al.
Published: (2023-10-01)
by: Xingyi Wu, et al.
Published: (2023-10-01)
Reinforcement mechanism analysis of lattice beam and prestressed anchor rod system for loess slope
by: Yang Liu, et al.
Published: (2023-05-01)
by: Yang Liu, et al.
Published: (2023-05-01)
Continuous Prestress in Launched Extradosed Bridges
by: Philippe Van Bogaert, et al.
Published: (2019-06-01)
by: Philippe Van Bogaert, et al.
Published: (2019-06-01)
Repair Options for Corrosion-damaged Prestressed Concrete Bridges
by: Sharma Suraksha, et al.
Published: (2024-06-01)
by: Sharma Suraksha, et al.
Published: (2024-06-01)
Prestress Loss Law of Anchor Cables and Deformation Control for Metro Station Deep Foundation Pit in Soil-rock Composite Strata
by: SUN Chao, et al.
Published: (2025-06-01)
by: SUN Chao, et al.
Published: (2025-06-01)
Exploring the feasibility of prestressed anchor cables as an alternative to temporary support in the excavation of super-large-span tunnel
by: Shunhua Zhou, et al.
Published: (2024-06-01)
by: Shunhua Zhou, et al.
Published: (2024-06-01)
NONLINEAR PRESTRESS OF SPACE CABLE NET STRUCTURES
by: Shna Jabar Abdulkarim, et al.
Published: (2024-03-01)
by: Shna Jabar Abdulkarim, et al.
Published: (2024-03-01)
A Safety Monitoring Method for Anchor Cable Prestress During Slope Construction Based on Spatial Clustering and a Bayesian Panel Vector Autoregression Model
by: Lin Cheng, et al.
Published: (2023-01-01)
by: Lin Cheng, et al.
Published: (2023-01-01)
Deformation monitoring and numerical simulation of prestressed concrete beam with local corrosion and fracture of prestressed steel
by: Wenjie Song, et al.
Published: (2023-12-01)
by: Wenjie Song, et al.
Published: (2023-12-01)
Study on damage-stress loss coupling model of rock and prestressed anchor cable in dry-wet environment
by: Yu Zhao, et al.
Published: (2023-12-01)
by: Yu Zhao, et al.
Published: (2023-12-01)
Assessment of Mechanical Properties of Corroded Prestressing Strands
by: Chi-Ho Jeon, et al.
Published: (2020-06-01)
by: Chi-Ho Jeon, et al.
Published: (2020-06-01)
Analytical Solution for Seismic Stability of 3D Rock Slope Reinforced with Prestressed Anchor Cables
by: Yushan Yang, et al.
Published: (2024-05-01)
by: Yushan Yang, et al.
Published: (2024-05-01)
Analytical analysis for horizontal displacement of pile anchor support structure considering prestress
by: Yong-qiang Ling, et al.
Published: (2023-09-01)
by: Yong-qiang Ling, et al.
Published: (2023-09-01)
Centrifugal test on the mechanical characteristics of existing prestressed anchor bolts in highway widening
by: Guan Jiang, et al.
Published: (2024-10-01)
by: Guan Jiang, et al.
Published: (2024-10-01)
Development of a New Uplift Pile with Prestressed Semi-Bonded Composite Anchor
by: Zongyuan Mao, et al.
Published: (2022-09-01)
by: Zongyuan Mao, et al.
Published: (2022-09-01)
Monitoring and Analysis of Prestress Loss in Prestressed Box Girder Bridges Strengthened with External Prestressing
by: Haoran Guo, et al.
Published: (2024-07-01)
by: Haoran Guo, et al.
Published: (2024-07-01)
Effects of Prestressing Magnitude and Position on Seismic Performance of Unbonded Prestressed Concrete Beams
by: Dong Chen, et al.
Published: (2024-02-01)
by: Dong Chen, et al.
Published: (2024-02-01)
RFID Autonomous Sensors for Monitoring Corrosion on Prestressed Concrete Bridges
by: Karim Bouzaffour, et al.
Published: (2024-04-01)
by: Karim Bouzaffour, et al.
Published: (2024-04-01)
Influence of the cable´s layout on the shearing resistance of prestressed concrete beams
by: O. A. SOUZA JUNIOR, et al.
by: O. A. SOUZA JUNIOR, et al.
Steel Strand Corrosion and Corrosion-Induced Cracking in Prestressed Concrete Under Stray Current
by: Yuancheng Ni, et al.
Published: (2025-10-01)
by: Yuancheng Ni, et al.
Published: (2025-10-01)
Optimized Design of Anchor Plates for 2200 MPa-Class Prestressing Anchorage Zones
by: Xin Lu, et al.
Published: (2024-04-01)
by: Xin Lu, et al.
Published: (2024-04-01)
Research on prestressed loading strut of cable supported portal frame
by: Shuhong Liu, et al.
Published: (2022-08-01)
by: Shuhong Liu, et al.
Published: (2022-08-01)
Behaviour of ambient cured prestressed and non-prestressed geopolymer concrete beams
by: Thakkar Sonal, et al.
Published: (2022-06-01)
by: Thakkar Sonal, et al.
Published: (2022-06-01)
Transfer Length and Prestress Losses of a Prestressed Concrete Box Girder with 18 mm Straight Strands
by: Xin Jiang, et al.
Published: (2023-07-01)
by: Xin Jiang, et al.
Published: (2023-07-01)
Similar Items
-
Analysis of Re-Tensioning Time of Anchor Cable Based on New Prestress Loss Model
by: Keyou Shi, et al.
Published: (2021-05-01) -
A Long-Term Monitoring Method of Corrosion Damage of Prestressed Anchor Cable
by: Jianzhi Li, et al.
Published: (2023-03-01) -
A New Prestress Loss Calculation Model of Anchor Cable in Pile–Anchor Structure
by: Xing Gao, et al.
Published: (2022-04-01) -
Study on the Effect of Anchor Cable Prestress Loss on Foundation Stability
by: Tongju Xing, et al.
Published: (2024-06-01) -
Calculation method for holding prestress of corroded prestressed anchor cable in long-term operation slope
by: Zhao Yang, et al.
Published: (2023-08-01)