Schedule Risk Analysis Using Monte Carlo Simulation for Residential Projects.
Scheduling is an essential part of construction project management. Planning and scheduling of construction tasks help engineers to complete the project on time and within the budget. Most of the construction project failed to finish within planned duration; one of the reasons is regarded to estimat...
| 出版年: | Zanco Journal of Pure and Applied Sciences |
|---|---|
| 主要な著者: | Khalil Ismail Wali, Shamal Ali Othman |
| フォーマット: | 論文 |
| 言語: | 英語 |
| 出版事項: |
Salahaddin University-Erbil
2019-10-01
|
| 主題: | |
| オンライン・アクセス: | https://zancojournals.su.edu.krd/index.php/JPAS/article/view/2500 |
類似資料
PENJADWALAN PROYEK DENGAN PENERAPAN SIMULASI MONTE CARLO PADA METODE PROGRAM EVALUATION REVIEW AND TECHNIQUE (PERT)
著者:: Widya Nurul Shofa, 等
出版事項: (2017-12-01)
著者:: Widya Nurul Shofa, 等
出版事項: (2017-12-01)
Estimating Construction Project Duration and Costs upon Completion Using Monte Carlo Simulations and Improved Earned Value Management
著者:: Jie Deng, 等
出版事項: (2022-12-01)
著者:: Jie Deng, 等
出版事項: (2022-12-01)
SCHEDULING ANALYSIS BEDUGUL VILLA CONSTRUCTION PROJECT USING PERT AND CPM METHODS
著者:: Kiswara Agung Santoso, 等
出版事項: (2024-03-01)
著者:: Kiswara Agung Santoso, 等
出版事項: (2024-03-01)
Fast Algorithm for High-Throughput Screening Scheduling Based on the PERT/CPM Project Management Technique
著者:: Eugene Levner, 等
出版事項: (2024-03-01)
著者:: Eugene Levner, 等
出版事項: (2024-03-01)
Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants
著者:: Hyun-Chul Lee, 等
出版事項: (2018-10-01)
著者:: Hyun-Chul Lee, 等
出版事項: (2018-10-01)
Critical Path Method & Project Evaluation and Review Technique: A Neutrosophic Review
著者:: Navya Pratyusha M, 等
出版事項: (2024-05-01)
著者:: Navya Pratyusha M, 等
出版事項: (2024-05-01)
Efficient Procedure to Scheduling Construction Projects at the Planning Phase
著者:: Tsegaye Matiwos
出版事項: (2019-01-01)
著者:: Tsegaye Matiwos
出版事項: (2019-01-01)
Risk Analysis of Modest Housing Projects Scheduling using Monte Carlo Simulation
著者:: Mochammad Fikri Nur Djohim, 等
出版事項: (2024-09-01)
著者:: Mochammad Fikri Nur Djohim, 等
出版事項: (2024-09-01)
Monte Carlo Simulation for Enhancing the Schedule Completion Forecast of Jakarta Central Railway Station Construction Project
著者:: Mohammad Ichsan, 等
出版事項: (2025-07-01)
著者:: Mohammad Ichsan, 等
出版事項: (2025-07-01)
Examining the Value of Monte Carlo Simulation for Project Time Management
著者:: Goran Avlijas
出版事項: (2019-01-01)
著者:: Goran Avlijas
出版事項: (2019-01-01)
The Dynamic of Project Monitoring and Evaluation Mechanisms within Modern Organizations
著者:: Florin TACHE, 等
出版事項: (2013-10-01)
著者:: Florin TACHE, 等
出版事項: (2013-10-01)
Optimalisasi penjadwalan proyek pembangunan pabrik kelapa sawit dengan menggunakan metode PERT dan CPM pada PT. Bintang Riski Abadi
著者:: Rio Marpaung, 等
出版事項: (2022-08-01)
著者:: Rio Marpaung, 等
出版事項: (2022-08-01)
PENERAPAN METODE PERT DAN CPM DALAM PELAKSANAAN PROYEK PEMBANGUNAN JALAN PAVING UNTUK MENCAPAI EFEKTIVITAS WAKTU PENYELESAIAN PROYEK
著者:: Eva Dewi Yusdiana, 等
出版事項: (2018-12-01)
著者:: Eva Dewi Yusdiana, 等
出版事項: (2018-12-01)
Scheduling of building projects taking into account the time buffers determined on the basis of risk analysis
著者:: Mieczysław Połoński
出版事項: (2013-03-01)
著者:: Mieczysław Połoński
出版事項: (2013-03-01)
The evaluation of risky investment projects
著者:: Milanović Dragan Lj., 等
出版事項: (2010-01-01)
著者:: Milanović Dragan Lj., 等
出版事項: (2010-01-01)
Creating probabilistic construction schedules in Microsoft Project
著者:: Sergey Alеkseevich Bolotin, 等
出版事項: (2023-06-01)
著者:: Sergey Alеkseevich Bolotin, 等
出版事項: (2023-06-01)
Implementasi CPM dan PERT dalam Memprediksi Durasi serta Biaya Pembangunan Musala Al-Ikhlas di Kotawaringin Barat
著者:: Rifa Auliya'ul Husna, 等
出版事項: (2022-12-01)
著者:: Rifa Auliya'ul Husna, 等
出版事項: (2022-12-01)
Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System
著者:: Georgios K. Koulinas, 等
出版事項: (2020-07-01)
著者:: Georgios K. Koulinas, 等
出版事項: (2020-07-01)
Neutrosophic Statistics for Project Management. Application to a Computer System Project
著者:: Ariel Romero Fernández, 等
出版事項: (2021-07-01)
著者:: Ariel Romero Fernández, 等
出版事項: (2021-07-01)
Application of time-cost trade-off model in forest management projects: The case of Oak decline project
著者:: Mehdi Zandebasiri, 等
出版事項: (2019-12-01)
著者:: Mehdi Zandebasiri, 等
出版事項: (2019-12-01)
Project Risk in the Context of Construction Schedules—Combined Monte Carlo Simulation and Time at Risk (TaR) Approach: Insights from the Fort Bema Housing Estate Complex
著者:: Janusz Sobieraj, 等
出版事項: (2022-01-01)
著者:: Janusz Sobieraj, 等
出版事項: (2022-01-01)
Optimization model with nonlinear programming and Monte Carlo simulation of an industrial fishing project
著者:: Christian Ramos Angeles, 等
出版事項: (2019-12-01)
著者:: Christian Ramos Angeles, 等
出版事項: (2019-12-01)
PERENCANAAN MANAJEMEN PROYEK DALAM MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SUMBER DAYA PERUSAHAAN (Studi Kasus : Qiscus Pte Ltd)
著者:: Ganesstri Padma Arianie, 等
出版事項: (2017-09-01)
著者:: Ganesstri Padma Arianie, 等
出版事項: (2017-09-01)
The use of Monte Carlo simulation technique to support investment decisions
著者:: Rima Tamošiūnienė, 等
出版事項: (2006-06-01)
著者:: Rima Tamošiūnienė, 等
出版事項: (2006-06-01)
ASSESSMENT OF SCHEDULE UNCERTAINTY AND RISK MITIGATION IN ACCELERATED BRIDGE CONSTRUCTION USING PERT
著者:: Alfandi Rizki Pratama Rolobessy, 等
出版事項: (2025-09-01)
著者:: Alfandi Rizki Pratama Rolobessy, 等
出版事項: (2025-09-01)
An improved Monte Carlo Tree Search approach to workflow scheduling
著者:: Hok-Leung Kung, 等
出版事項: (2022-12-01)
著者:: Hok-Leung Kung, 等
出版事項: (2022-12-01)
Investigating the Monte-Carlo Tree Search approach for the job shop scheduling problem
著者:: Laurie Boveroux, 等
出版事項: (2025-01-01)
著者:: Laurie Boveroux, 等
出版事項: (2025-01-01)
Analisis Pertukaran Waktu dan Biaya Menggunakan Metode Time Cost Trade Off (TCTO) pada Proyek Pembangunan Perumahan di PT. X
著者:: Nailul Izzah
出版事項: (2018-02-01)
著者:: Nailul Izzah
出版事項: (2018-02-01)
Modeling of CPM/LOB integrated Scheduling Technique for Repetitive Construction Projects: Case of Multiple-Crews with Fuzzy Time Data
著者:: Mai El-Nawawy, 等
出版事項: (2020-12-01)
著者:: Mai El-Nawawy, 等
出版事項: (2020-12-01)
Evaluating the planning efficiency for repetitive construction projects using Monte Carlo simulation technique
著者:: Ahmed M. Ebid, 等
出版事項: (2025-07-01)
著者:: Ahmed M. Ebid, 等
出版事項: (2025-07-01)
A Multilevel Monte Carlo Approach for a Stochastic Optimal Control Problem Based on the Gradient Projection Method
著者:: Changlun Ye, 等
出版事項: (2023-02-01)
著者:: Changlun Ye, 等
出版事項: (2023-02-01)
Infrastructure Construction Projects Scheduling Using Manual-Program Evaluation and Review Technique (M-PERT) Method. Case Study: Indonesian Sunda Strait Bridge
著者:: Reza Ferial Ashadi, 等
出版事項: (2022-08-01)
著者:: Reza Ferial Ashadi, 等
出版事項: (2022-08-01)
Application of fuzzy PERT method in project planning
著者:: Toljaga-Nikolić Danijela V., 等
出版事項: (2014-01-01)
著者:: Toljaga-Nikolić Danijela V., 等
出版事項: (2014-01-01)
Integral and dynamic methodology applied to scheduling and control project
著者:: Leonardo José Gonzalez, 等
出版事項: (2012-05-01)
著者:: Leonardo José Gonzalez, 等
出版事項: (2012-05-01)
Monte Carlo Characterization of the Trimage Brain PET System
著者:: Luigi Masturzo, 等
出版事項: (2022-01-01)
著者:: Luigi Masturzo, 等
出版事項: (2022-01-01)
Effects of Applying BPM Critical Path and Statistical PERT Analysis on CFM Practices and Profit Maximization in Hotel Industry
著者:: Mohamed Hany B. MOUSSA, 等
出版事項: (2025-09-01)
著者:: Mohamed Hany B. MOUSSA, 等
出版事項: (2025-09-01)
Using Ant Algorithm to Find the Optimal Critical Path of a Projects Network
著者:: Ziyad Mohammed, 等
出版事項: (2021-06-01)
著者:: Ziyad Mohammed, 等
出版事項: (2021-06-01)
Applying Monte Carlo Simulation to Measuring Risk Factors in Information Technology Projects
著者:: Hamid Shahbandarzad, 等
出版事項: (2015-05-01)
著者:: Hamid Shahbandarzad, 等
出版事項: (2015-05-01)
İnşaat Projelerinin Ağ Diyagramlarıyla Planlanmasında Süre-Maliyet Değişimlerinin Yeni İşgücü Eklenmesi Orijininde Analizi
著者:: Latif Onur UĞUR, 等
出版事項: (2014-09-01)
著者:: Latif Onur UĞUR, 等
出版事項: (2014-09-01)
İnşaat Projelerinin Ağ Diyagramlarıyla Planlanmasında Süre-Maliyet Değişimlerinin Yeni İşgücü Eklenmesi Orijininde Analizi
著者:: Latif Onur UĞUR, 等
出版事項: (2014-09-01)
著者:: Latif Onur UĞUR, 等
出版事項: (2014-09-01)
類似資料
-
PENJADWALAN PROYEK DENGAN PENERAPAN SIMULASI MONTE CARLO PADA METODE PROGRAM EVALUATION REVIEW AND TECHNIQUE (PERT)
著者:: Widya Nurul Shofa, 等
出版事項: (2017-12-01) -
Estimating Construction Project Duration and Costs upon Completion Using Monte Carlo Simulations and Improved Earned Value Management
著者:: Jie Deng, 等
出版事項: (2022-12-01) -
SCHEDULING ANALYSIS BEDUGUL VILLA CONSTRUCTION PROJECT USING PERT AND CPM METHODS
著者:: Kiswara Agung Santoso, 等
出版事項: (2024-03-01) -
Fast Algorithm for High-Throughput Screening Scheduling Based on the PERT/CPM Project Management Technique
著者:: Eugene Levner, 等
出版事項: (2024-03-01) -
Schedule Modeling to Estimate Typical Construction Durations and Areas of Risk for 1000 MW Ultra-Critical Coal-Fired Power Plants
著者:: Hyun-Chul Lee, 等
出版事項: (2018-10-01)