Balancing time and physical effort in two-sided assembly lines

In assembly line balancing problems, time is balanced among workers. This does not necessarily balance their physical effort. The effort exerted by workers varies depending on the type of the job, and the size and weight of the component. In the two-sided assembly lines, commonly used for heavy indu...

Full description

Bibliographic Details
Published in:Ain Shams Engineering Journal
Main Authors: Nessren Zamzam, Amin K. El-Kharbotly, Yomna Sadek
Format: Article
Language:English
Published: Elsevier 2021-09-01
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2090447921000964
_version_ 1849323518927306752
author Nessren Zamzam
Amin K. El-Kharbotly
Yomna Sadek
author_facet Nessren Zamzam
Amin K. El-Kharbotly
Yomna Sadek
author_sort Nessren Zamzam
collection DOAJ
container_title Ain Shams Engineering Journal
description In assembly line balancing problems, time is balanced among workers. This does not necessarily balance their physical effort. The effort exerted by workers varies depending on the type of the job, and the size and weight of the component. In the two-sided assembly lines, commonly used for heavy industries, the variation in physical effort among workers is more emphasized. The unbalanced effort leads to fatigue, and may lower productivity and quality. This work aims at balancing the physical effort among workers in the two-sided assembly lines, while considering other conventional objectives. A genetic algorithm and a new decoding scheme are proposed. An effort smoothness index (ESI) is introduced to measure the variation in effort among workers. Results prove that balancing the physical effort is influential and can be achieved at no extra cost for most cases. Effort balancing is harder to achieve in difficult problems; of high order of strength.
format Article
id doaj-art-35ea7a7ec2df4e7b8bb454b3b2b2ccd8
institution Directory of Open Access Journals
issn 2090-4479
language English
publishDate 2021-09-01
publisher Elsevier
record_format Article
spelling doaj-art-35ea7a7ec2df4e7b8bb454b3b2b2ccd82025-09-02T06:10:32ZengElsevierAin Shams Engineering Journal2090-44792021-09-011232921293310.1016/j.asej.2021.02.009Balancing time and physical effort in two-sided assembly linesNessren Zamzam0Amin K. El-Kharbotly1Yomna Sadek2Department of Design and Production Engineering, Faculty of Engineering, Ain Shams University, 1 Elsarayat St., Abbaseya, 11517 Cairo, EgyptDepartment of Design and Production Engineering, Faculty of Engineering, Ain Shams University, 1 Elsarayat St., Abbaseya, 11517 Cairo, EgyptCorresponding author.; Department of Design and Production Engineering, Faculty of Engineering, Ain Shams University, 1 Elsarayat St., Abbaseya, 11517 Cairo, EgyptIn assembly line balancing problems, time is balanced among workers. This does not necessarily balance their physical effort. The effort exerted by workers varies depending on the type of the job, and the size and weight of the component. In the two-sided assembly lines, commonly used for heavy industries, the variation in physical effort among workers is more emphasized. The unbalanced effort leads to fatigue, and may lower productivity and quality. This work aims at balancing the physical effort among workers in the two-sided assembly lines, while considering other conventional objectives. A genetic algorithm and a new decoding scheme are proposed. An effort smoothness index (ESI) is introduced to measure the variation in effort among workers. Results prove that balancing the physical effort is influential and can be achieved at no extra cost for most cases. Effort balancing is harder to achieve in difficult problems; of high order of strength.http://www.sciencedirect.com/science/article/pii/S2090447921000964Assembly lineTwo-sidedGenetic algorithmPhysical effortSmooth workloadErgonomics
spellingShingle Nessren Zamzam
Amin K. El-Kharbotly
Yomna Sadek
Balancing time and physical effort in two-sided assembly lines
Assembly line
Two-sided
Genetic algorithm
Physical effort
Smooth workload
Ergonomics
title Balancing time and physical effort in two-sided assembly lines
title_full Balancing time and physical effort in two-sided assembly lines
title_fullStr Balancing time and physical effort in two-sided assembly lines
title_full_unstemmed Balancing time and physical effort in two-sided assembly lines
title_short Balancing time and physical effort in two-sided assembly lines
title_sort balancing time and physical effort in two sided assembly lines
topic Assembly line
Two-sided
Genetic algorithm
Physical effort
Smooth workload
Ergonomics
url http://www.sciencedirect.com/science/article/pii/S2090447921000964
work_keys_str_mv AT nessrenzamzam balancingtimeandphysicaleffortintwosidedassemblylines
AT aminkelkharbotly balancingtimeandphysicaleffortintwosidedassemblylines
AT yomnasadek balancingtimeandphysicaleffortintwosidedassemblylines