Mechanical Behavior of Urban Rail Transit Station Structure Based on Existing Shield Tunnel Interval Underground Excavation Construction

Objective Cancer Hospital Station on Shenzhen Rail Transit Line 14 adopts a scheme of large-diameter (8.5 m) shield tunnel expansion featuring tunnel-first and station-later. During the connection of the main station structure and auxiliary entrances in underground excavation, the construction of la...

Full description

Bibliographic Details
Published in:Chengshi guidao jiaotong yanjiu
Main Authors: ZHANG Zhongan, PAN Ye, GUO Zhenkun, ZHANG Jiaolong, GAO Yimin, LIU Xian
Format: Article
Language:Chinese
Published: Urban Mass Transit Magazine Press 2024-08-01
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.08.023.html