Contributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBI

ITER’s NBI systems are a first of its kind system with very challenging targets for the RF-driven ion source and the acceleration stage. In a step ladder approach, the ion source test facilities BATMAN Upgrade (BUG) and ELISE support the activities carried out at the Neutral Beam Test Facility, Padu...

Full description

Bibliographic Details
Published in:Nuclear Fusion
Main Authors: U. Fantz, D. Wünderlich, C. Wimmer, M. Barnes, N. den Harder, B. Heinemann, A. Heiler, M. Lindqvist, F. Merk, A. Navarro, R. Nocentini, G. Orozco, R. Riedl, D. Yordanov, D. Zielke
Format: Article
Language:English
Published: IOP Publishing 2024-01-01
Subjects:
Online Access:https://doi.org/10.1088/1741-4326/ad5dcd
_version_ 1850361526654861312
author U. Fantz
D. Wünderlich
C. Wimmer
M. Barnes
N. den Harder
B. Heinemann
A. Heiler
M. Lindqvist
F. Merk
A. Navarro
R. Nocentini
G. Orozco
R. Riedl
D. Yordanov
D. Zielke
author_facet U. Fantz
D. Wünderlich
C. Wimmer
M. Barnes
N. den Harder
B. Heinemann
A. Heiler
M. Lindqvist
F. Merk
A. Navarro
R. Nocentini
G. Orozco
R. Riedl
D. Yordanov
D. Zielke
author_sort U. Fantz
collection DOAJ
container_title Nuclear Fusion
description ITER’s NBI systems are a first of its kind system with very challenging targets for the RF-driven ion source and the acceleration stage. In a step ladder approach, the ion source test facilities BATMAN Upgrade (BUG) and ELISE support the activities carried out at the Neutral Beam Test Facility, Padua, which is equipped with the ion source facility SPIDER and with MITICA being equivalent to the ITER Heating Neutral Beam injector (HNB), capable of operating at the full power and pulse length of the ITER HNBs. The contributions of the prototype ion source at BUG (1/8 scale) and the size scaling experiment ELISE (1/2 size ITER source) to the roadmap are manifold: for hydrogen operation the ion source performance is demonstrated in several sequential 1000 s pulses, whereas long pulse deuterium operation is limited by the heat load of the co-extracted electrons on the extraction grid. Measures like special magnetic filter field configurations or biasing of surfaces and improved Cs management are identified. Both facilities have recently been extended to full steady state compatibility and very first insights of the ion source performance with steady state extraction compared to the previously used beam blips (10 s extraction every 150 s) are already gained. A pulse length of 400 s, as required for the first deuterium campaigns at ITER, seems to be feasible soon, whereas the one hour pulse imposes the highest challenge to overcome. Investigations on beam divergence revealed a divergence at the upper limit of the acceptable value for the HNB. Measurements on the beam uniformity on the scale of beamlet groups and grid segments at ELISE demonstrated a uniformity of better than the required 90%. BUG and ELISE gave input to recent implementations at SPIDER; MITICA and ITER’s NBI. Still open points and challenges are addressed, for which a continuation of the step ladder approach is essential.
format Article
id doaj-art-e1e4e6cef06e4e4f85c7996b005bcd67
institution Directory of Open Access Journals
issn 0029-5515
language English
publishDate 2024-01-01
publisher IOP Publishing
record_format Article
spelling doaj-art-e1e4e6cef06e4e4f85c7996b005bcd672025-08-19T23:04:55ZengIOP PublishingNuclear Fusion0029-55152024-01-0164808606310.1088/1741-4326/ad5dcdContributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBIU. Fantz0https://orcid.org/0000-0003-2239-3477D. Wünderlich1https://orcid.org/0000-0003-2810-9633C. Wimmer2https://orcid.org/0000-0003-4691-4265M. Barnes3N. den Harder4https://orcid.org/0000-0002-1224-9108B. Heinemann5A. Heiler6https://orcid.org/0000-0002-0026-0828M. Lindqvist7https://orcid.org/0000-0002-1795-5730F. Merk8https://orcid.org/0000-0002-0408-0832A. Navarro9https://orcid.org/0009-0001-2321-7849R. Nocentini10G. Orozco11R. Riedl12D. Yordanov13D. Zielke14https://orcid.org/0000-0003-4231-4350Max-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyMax-Planck-Institut für Plasmaphysik , Garching, GermanyITER’s NBI systems are a first of its kind system with very challenging targets for the RF-driven ion source and the acceleration stage. In a step ladder approach, the ion source test facilities BATMAN Upgrade (BUG) and ELISE support the activities carried out at the Neutral Beam Test Facility, Padua, which is equipped with the ion source facility SPIDER and with MITICA being equivalent to the ITER Heating Neutral Beam injector (HNB), capable of operating at the full power and pulse length of the ITER HNBs. The contributions of the prototype ion source at BUG (1/8 scale) and the size scaling experiment ELISE (1/2 size ITER source) to the roadmap are manifold: for hydrogen operation the ion source performance is demonstrated in several sequential 1000 s pulses, whereas long pulse deuterium operation is limited by the heat load of the co-extracted electrons on the extraction grid. Measures like special magnetic filter field configurations or biasing of surfaces and improved Cs management are identified. Both facilities have recently been extended to full steady state compatibility and very first insights of the ion source performance with steady state extraction compared to the previously used beam blips (10 s extraction every 150 s) are already gained. A pulse length of 400 s, as required for the first deuterium campaigns at ITER, seems to be feasible soon, whereas the one hour pulse imposes the highest challenge to overcome. Investigations on beam divergence revealed a divergence at the upper limit of the acceptable value for the HNB. Measurements on the beam uniformity on the scale of beamlet groups and grid segments at ELISE demonstrated a uniformity of better than the required 90%. BUG and ELISE gave input to recent implementations at SPIDER; MITICA and ITER’s NBI. Still open points and challenges are addressed, for which a continuation of the step ladder approach is essential.https://doi.org/10.1088/1741-4326/ad5dcdneutral beam injectionITER NBInegative ion sources
spellingShingle U. Fantz
D. Wünderlich
C. Wimmer
M. Barnes
N. den Harder
B. Heinemann
A. Heiler
M. Lindqvist
F. Merk
A. Navarro
R. Nocentini
G. Orozco
R. Riedl
D. Yordanov
D. Zielke
Contributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBI
neutral beam injection
ITER NBI
negative ion sources
title Contributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBI
title_full Contributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBI
title_fullStr Contributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBI
title_full_unstemmed Contributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBI
title_short Contributions of the extended ELISE and BATMAN Upgrade test facilities to the roadmap towards ITER NBI
title_sort contributions of the extended elise and batman upgrade test facilities to the roadmap towards iter nbi
topic neutral beam injection
ITER NBI
negative ion sources
url https://doi.org/10.1088/1741-4326/ad5dcd
work_keys_str_mv AT ufantz contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT dwunderlich contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT cwimmer contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT mbarnes contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT ndenharder contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT bheinemann contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT aheiler contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT mlindqvist contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT fmerk contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT anavarro contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT rnocentini contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT gorozco contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT rriedl contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT dyordanov contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi
AT dzielke contributionsoftheextendedeliseandbatmanupgradetestfacilitiestotheroadmaptowardsiternbi