A Crew Scheduling Model to Incrementally Optimize Workforce Assignments for Offshore Wind Farm Constructions
In the literature, different authors attribute between 15% to 30% of a wind farm’s costs to logistics during the installation, e.g., for vessels or personnel. Currently, there exist only a few approaches for crew scheduling in the offshore area. However, current approaches only satisfy subsets of th...
| Published in: | Energies |
|---|---|
| Main Authors: | Daniel Rippel, Fatemeh Abasian Foroushani, Michael Lütjen, Michael Freitag |
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2021-10-01
|
| Subjects: | |
| Online Access: | https://www.mdpi.com/1996-1073/14/21/6963 |
Similar Items
Evaluation of Loading Bay Restrictions for the Installation of Offshore Wind Farms Using a Combination of Mixed-Integer Linear Programming and Model Predictive Control
by: Daniel Rippel, et al.
Published: (2019-11-01)
by: Daniel Rippel, et al.
Published: (2019-11-01)
A Sequential Optimization Approach for the Vehicle and Crew Scheduling Problem of a Fleet of Electric Buses
by: Katholiki Triommati, et al.
Published: (2025-09-01)
by: Katholiki Triommati, et al.
Published: (2025-09-01)
An integrated model for aircraft routing and crew scheduling: Lagrangian Relaxation and metaheuristic algorithm
by: Masoumeh Mirjafari, et al.
Published: (2020-01-01)
by: Masoumeh Mirjafari, et al.
Published: (2020-01-01)
Characteristics and Applicability Analysis of Flexible Scheduling for Urban Rail Transit Crews
by: Tianjie XU
Published: (2024-02-01)
by: Tianjie XU
Published: (2024-02-01)
Combined Optimization of Maintenance Works and Crews in Railway Networks
by: Nikoletta Gkonou, et al.
Published: (2023-09-01)
by: Nikoletta Gkonou, et al.
Published: (2023-09-01)
Integrated Crew Scheduling and Roster Problem for Trainmasters of Passenger Railway Transportation
by: Dung-Ying Lin, et al.
Published: (2019-01-01)
by: Dung-Ying Lin, et al.
Published: (2019-01-01)
Two Mathematical Models for Railway Crew Scheduling Problem
by: Amin Khosravi Bizhaem, et al.
Published: (2017-10-01)
by: Amin Khosravi Bizhaem, et al.
Published: (2017-10-01)
ABOUT OF THE ASSIGNING APPEARANCES TO LOCOMOTIVE CREWS
by: Sergey P. Vakulenko, et al.
Published: (2024-10-01)
by: Sergey P. Vakulenko, et al.
Published: (2024-10-01)
KASTOR – A VEHICLE AND CREW SCHEDULING SYSTEM FOR REGULAR BUS PASSENGER TRANSPORT
by: Stanislav PALÚCH, et al.
Published: (2017-04-01)
by: Stanislav PALÚCH, et al.
Published: (2017-04-01)
Crew Scheduling Considering both Crew Duty Time Difference and Cost on Urban Rail System
by: Wenliang Zhou, et al.
Published: (2016-11-01)
by: Wenliang Zhou, et al.
Published: (2016-11-01)
The operational flight and multi-crew scheduling problem
by: Stojković Mirela, et al.
Published: (2005-01-01)
by: Stojković Mirela, et al.
Published: (2005-01-01)
Jumping Ship Crew In Cruise Ship Crew Recruitment At PT. CWT
by: Nabila Nurul Ikhlas, et al.
Published: (2024-11-01)
by: Nabila Nurul Ikhlas, et al.
Published: (2024-11-01)
Novel search space updating heuristics-based genetic algorithm for optimizing medium-scale airline crew pairing problems
by: Nihan Çetin Demirel, et al.
Published: (2017-01-01)
by: Nihan Çetin Demirel, et al.
Published: (2017-01-01)
The Column Generatiion and Traiin Crew Scheduliing
by: Jaroslav Janacek, et al.
Published: (2016-03-01)
by: Jaroslav Janacek, et al.
Published: (2016-03-01)
Bilateral Matching Decision Model and Calculation of High-Speed Railway Train Crew Members
by: Wen Li, et al.
Published: (2024-11-01)
by: Wen Li, et al.
Published: (2024-11-01)
Crew optimization in urban railway systems: case study of Rio de Janeiro VLT
by: Vitor Nunes Cruz, et al.
Published: (2024-11-01)
by: Vitor Nunes Cruz, et al.
Published: (2024-11-01)
A Multi-Objective Mathematical Formulation for the Airline Crew Scheduling Problem: MODE and NSGA-II Solution Approaches
by: Vahid Baradaran, et al.
Published: (2021-03-01)
by: Vahid Baradaran, et al.
Published: (2021-03-01)
An integrated mathematical model for aircraft routing and crew scheduling for airlines with multi fleet and multi maintenance hub
by: Alireza Rashidi Komijan, et al.
Published: (2019-12-01)
by: Alireza Rashidi Komijan, et al.
Published: (2019-12-01)
Improvement of fatigue management methodology related to flight crew
by: Iyad Alomar, et al.
Published: (2024-09-01)
by: Iyad Alomar, et al.
Published: (2024-09-01)
Preconditioning in the Backtracking Duty Generation of Passenger Rail Crew Scheduling: A Case Study
by: Matyas Koniorczyk, et al.
Published: (2015-05-01)
by: Matyas Koniorczyk, et al.
Published: (2015-05-01)
Substantiation of the approach to the formation of the crews in rowing
by: O.O. Iakovenko
Published: (2013-12-01)
by: O.O. Iakovenko
Published: (2013-12-01)
Using BIM Model and Genetic Algorithms to Optimize The Crew Assignment for Construction Project Planning
by: Yi-Jao Chen, et al.
Published: (2014-01-01)
by: Yi-Jao Chen, et al.
Published: (2014-01-01)
Evaluation of the Impact of Weather-Related Limitations on the Installation of Offshore Wind Turbine Towers
by: Stephan Oelker, et al.
Published: (2021-06-01)
by: Stephan Oelker, et al.
Published: (2021-06-01)
USE OF THE COMPETENCY APPROACH IN DETERMINING THE MINIMUM CREW OF THE VESSEL
by: Сергей Александрович КРАМСКОЙ
Published: (2015-05-01)
by: Сергей Александрович КРАМСКОЙ
Published: (2015-05-01)
Dynamic Model of Contingency Flight Crew Planning Extending to Crew Formation
by: Vojtech Graf, et al.
Published: (2021-09-01)
by: Vojtech Graf, et al.
Published: (2021-09-01)
A Sequential Workforce Scheduling and Routing Problem for the Retail Industry: A Case Study
by: Uğur Eliiyi, et al.
Published: (2022-12-01)
by: Uğur Eliiyi, et al.
Published: (2022-12-01)
Medical emergencies at sea: an analysis of ambulance-supported and autonomously performed operations by lifeboat crews
by: Daphne M. Messelink, et al.
Published: (2023-09-01)
by: Daphne M. Messelink, et al.
Published: (2023-09-01)
The main phenomena of space crews’ communication as a rationale for the modification of mission control communicative style
by: Natalia Supolkina, et al.
Published: (2023-06-01)
by: Natalia Supolkina, et al.
Published: (2023-06-01)
Logistic Decisions in the Installation of Offshore Wind Farms: A Conceptual Framework
by: Mario O. A. González, et al.
Published: (2024-11-01)
by: Mario O. A. González, et al.
Published: (2024-11-01)
Method for Modeling and Solving the Dynamic Scheduling Problem of the Repair Crew for Restoring Damaged Road Network
by: ZHANG Guofu, SHEN Yufeng, SONG Xiaoxiao, SU Zhaopin
Published: (2023-06-01)
by: ZHANG Guofu, SHEN Yufeng, SONG Xiaoxiao, SU Zhaopin
Published: (2023-06-01)
Editorial: Fast transit, crew health, and performance on extended duration space missions
by: Annette Louise Sobel
Published: (2024-02-01)
by: Annette Louise Sobel
Published: (2024-02-01)
A Reduced Semidefinite Programming Formulation for HA Assignment Problems in Sport Scheduling
by: Hugo José Lara, et al.
Published: (2018-12-01)
by: Hugo José Lara, et al.
Published: (2018-12-01)
Smart Crew Integrated Service System for Urban Rail Transit
by: Yongbing WAN
Published: (2024-02-01)
by: Yongbing WAN
Published: (2024-02-01)
Emotional Labor in Aviation: A Phenomenological Research on Cabin Crew
by: Ramazan Çoban, et al.
Published: (2024-12-01)
by: Ramazan Çoban, et al.
Published: (2024-12-01)
Decommissioning of Offshore Oil and Gas Installations under the International Law
by: Javad Kashani, et al.
Published: (2016-03-01)
by: Javad Kashani, et al.
Published: (2016-03-01)
Application of Fuzzy Delphi-AHP-TOPSIS for Selecting an International Crew Change Center in Taiwan
by: Tien-Chun Ho, et al.
Published: (2022-10-01)
by: Tien-Chun Ho, et al.
Published: (2022-10-01)
Resilience-oriented repair crew and network reconfiguration coordinated operational scheduling for post-event restoration
by: Fuju Zhou, et al.
Published: (2024-04-01)
by: Fuju Zhou, et al.
Published: (2024-04-01)
An Integrative Review on the Effectiveness of Crew Resource Management between Flight Deck and Cabin Crew
by: Mi-Jin Ra
Published: (2025-09-01)
by: Mi-Jin Ra
Published: (2025-09-01)
Development of Entering Order and Work-Volume Assignment Algorithms for the Management of Piping Components in Offshore Structure Construction
by: Jung Goo Park, et al.
Published: (2020-11-01)
by: Jung Goo Park, et al.
Published: (2020-11-01)
Service Restoration in Distribution Networks by Optimal Scheduling of Repair Crew and Mobile Power Sources
by: Qasem Asadi, et al.
Published: (2024-03-01)
by: Qasem Asadi, et al.
Published: (2024-03-01)
Similar Items
-
Evaluation of Loading Bay Restrictions for the Installation of Offshore Wind Farms Using a Combination of Mixed-Integer Linear Programming and Model Predictive Control
by: Daniel Rippel, et al.
Published: (2019-11-01) -
A Sequential Optimization Approach for the Vehicle and Crew Scheduling Problem of a Fleet of Electric Buses
by: Katholiki Triommati, et al.
Published: (2025-09-01) -
An integrated model for aircraft routing and crew scheduling: Lagrangian Relaxation and metaheuristic algorithm
by: Masoumeh Mirjafari, et al.
Published: (2020-01-01) -
Characteristics and Applicability Analysis of Flexible Scheduling for Urban Rail Transit Crews
by: Tianjie XU
Published: (2024-02-01) -
Combined Optimization of Maintenance Works and Crews in Railway Networks
by: Nikoletta Gkonou, et al.
Published: (2023-09-01)
