Selection the rational model of transport truck by the selective coal mining at the open pit Gacko
This paper gives the selection of the optimal model of trucks for transport of coal, and seam waste at the OP Gacko in terms of selective exploitation. Mining of coal and seam waste is carried out in two exploitation zones, the central and roof zone, and the coal and waste transport and disposal is...
| Published in: | Mining and Metallurgy Engineering Bor |
|---|---|
| Main Authors: | Stanić Nikola, Stepanović Saša, Bugarin Dejan, Gomilanović Miljan |
| Format: | Article |
| Language: | English |
| Published: |
Mining and Metallurgy Institute, Bor
2017-01-01
|
| Subjects: | |
| Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2017/2334-88361702023S.pdf |
Similar Items
Selection the optimal development options of mining operations in the Gacko coal basin
by: Stepanović Saša, et al.
Published: (2017-01-01)
by: Stepanović Saša, et al.
Published: (2017-01-01)
Analysis of coal quality in a function of selection level for mining at the open pit Gacko
by: Stepanović Saša, et al.
Published: (2017-01-01)
by: Stepanović Saša, et al.
Published: (2017-01-01)
Selection of a rational truck model for waste transport at the open pit Gacko using the ahp method
by: Stanić Nikola, et al.
Published: (2021-01-01)
by: Stanić Nikola, et al.
Published: (2021-01-01)
Selection the most favorable pump type and configuration of pump systems at the open pit Gračanica - Gacko
by: Stepanović Saša, et al.
Published: (2017-01-01)
by: Stepanović Saša, et al.
Published: (2017-01-01)
Determination the limit capacity of production the roof coal series at the open pit Gacko-Central Field in a function of use a discontinuous-combined exploitation system
by: Stanić Nikola, et al.
Published: (2019-01-01)
by: Stanić Nikola, et al.
Published: (2019-01-01)
Redistribution of excavation equipment for the purpose of achieving the desired capacity and improvement the utilization time of equipment
by: Doderović Aleksandar, et al.
Published: (2017-01-01)
by: Doderović Aleksandar, et al.
Published: (2017-01-01)
Protection system against water at the open pit Gacko with collective water collector as the capital structure
by: Doderović Aleksandar, et al.
Published: (2016-01-01)
by: Doderović Aleksandar, et al.
Published: (2016-01-01)
Selection the variant technical solution of the transport and service road to the eastern external landfill and collective water collector
by: Stepanović Saša, et al.
Published: (2019-01-01)
by: Stepanović Saša, et al.
Published: (2019-01-01)
Defence system from water of the open pit Gračanica - Gacko
by: Rajković Radmilo, et al.
Published: (2015-01-01)
by: Rajković Radmilo, et al.
Published: (2015-01-01)
Selection the optimal truck model for transport of by-products from the TPP Pljevlja to the Maljevac landfill
by: Stanić Nikola, et al.
Published: (2023-01-01)
by: Stanić Nikola, et al.
Published: (2023-01-01)
Selection of a rational solution for transport of the by-products from the combustion process in TPP Pljevlja to the Maljevac landfill
by: Stanić Nikola, et al.
Published: (2023-01-01)
by: Stanić Nikola, et al.
Published: (2023-01-01)
Flora of the Gacko technogenious soils
by: Malić Nenad, et al.
Published: (2011-01-01)
by: Malić Nenad, et al.
Published: (2011-01-01)
Dynamics of development the works of roof coal series of the open pit Gacko by the software Gemcom Gems: Module cut evaluation
by: Stanić Nikola, et al.
Published: (2016-01-01)
by: Stanić Nikola, et al.
Published: (2016-01-01)
Defining the remediation measures of the inner waste dump slopes at the open pit Gacko-Central Field
by: Stepanović Saša, et al.
Published: (2023-01-01)
by: Stepanović Saša, et al.
Published: (2023-01-01)
Potentiality of the raw material coal base from the Gacko deposit in a function of providing the energy fuel for strategic planning of the TPP Gacko 2
by: Vuković Boško, et al.
Published: (2019-01-01)
by: Vuković Boško, et al.
Published: (2019-01-01)
Evolution of coal ash solidification properties with disposal site depth and age, 'Gacko' Thermal power plant case
by: Knežević Dinko, et al.
Published: (2017-01-01)
by: Knežević Dinko, et al.
Published: (2017-01-01)
Technological benefits of relocation and extension a continuous part of the coal transport system
by: Doderović Aleksandar, et al.
Published: (2024-01-01)
by: Doderović Aleksandar, et al.
Published: (2024-01-01)
Future of Electric and Hydrogen Cars and Trucks: An Overview
by: Aiman Albatayneh, et al.
Published: (2023-04-01)
by: Aiman Albatayneh, et al.
Published: (2023-04-01)
Exploring the Role of Autonomous Trucks in Addressing Challenges within the Trucking Industry: A Comprehensive Review
by: Ali Hasiri, et al.
Published: (2024-08-01)
by: Ali Hasiri, et al.
Published: (2024-08-01)
Influence of ash slurry preparation technology on characteristics of 'Gacko' thermal power plant disposed ash
by: Beatović Sreten M., et al.
Published: (2014-01-01)
by: Beatović Sreten M., et al.
Published: (2014-01-01)
OPTIMISATION OF LOCATION AND PERFORMANCE PARAMETERS FOR THE CRUSHING AND TRANSFER STATIONS IN THE DEEP OPEN PIT MINES
by: Yuriy Vilkul, et al.
Published: (2021-11-01)
by: Yuriy Vilkul, et al.
Published: (2021-11-01)
Procedure for selection of gauge composition of truck tractors using integral coefficient
by: N. S. Zakharov, et al.
Published: (2021-12-01)
by: N. S. Zakharov, et al.
Published: (2021-12-01)
A Study of Automatic Operation System Principle Module for Open-pit Mine Truck Transportation
by: LU Xiangyang, et al.
Published: (2021-01-01)
by: LU Xiangyang, et al.
Published: (2021-01-01)
IMPROVING THE ORGANIZATION OF THE SHOVEL-TRUCK SYSTEMS IN OPEN-PIT COAL MINES
by: Mark KORYAGIN, et al.
Published: (2017-06-01)
by: Mark KORYAGIN, et al.
Published: (2017-06-01)
Planning the operation of Li-ion battery-powered trucks
by: Milisavljević Vladimir, et al.
Published: (2025-01-01)
by: Milisavljević Vladimir, et al.
Published: (2025-01-01)
Research on Selection and Matching of Truck-Shovel in Oversized Open-Pit Mines
by: Hai Xu, et al.
Published: (2023-03-01)
by: Hai Xu, et al.
Published: (2023-03-01)
Measurement and Analysis of Vibration Levels for Truck Transport Environment in Korea
by: Jongmin Park, et al.
Published: (2020-09-01)
by: Jongmin Park, et al.
Published: (2020-09-01)
Determining the structural parameters of slopes at the open pit Potrlica in the zone of separation Doganje
by: Stanić Nikola, et al.
Published: (2016-01-01)
by: Stanić Nikola, et al.
Published: (2016-01-01)
Freight Transport Costs Model Based on Truck Fleet Operational Parameters
by: Mirsad Kulović
Published: (2004-11-01)
by: Mirsad Kulović
Published: (2004-11-01)
A PESTLE analysis of the trucking industry: key insights and implications
by: Pamela Torres-Nunez, et al.
Published: (2024-12-01)
by: Pamela Torres-Nunez, et al.
Published: (2024-12-01)
Comparative analysis of geomechanical verification the slope stability in the zone of preventive maintenance hall of the coal mine Pljevlja
by: Milijanović Aleksandar, et al.
Published: (2022-01-01)
by: Milijanović Aleksandar, et al.
Published: (2022-01-01)
Comparative analysis of energy consumption and CO 2 emission in the example of combined reconfigured system at the open pit Potrlica
by: Stanić Nikola, et al.
Published: (2018-01-01)
by: Stanić Nikola, et al.
Published: (2018-01-01)
Distribution of weekly working hours of truck drivers in urban logistics
by: A. Asenov, et al.
Published: (2023-12-01)
by: A. Asenov, et al.
Published: (2023-12-01)
Automatic control of haul truck travel speed on open pits
by: Žikić Miodrag I., et al.
Published: (2018-01-01)
by: Žikić Miodrag I., et al.
Published: (2018-01-01)
Current status and development trend of intelligent transportation technology in China's open-pit mines
by: WANG Zhongxin, et al.
Published: (2022-06-01)
by: WANG Zhongxin, et al.
Published: (2022-06-01)
Roadway Safety: Logging Truck-Related Crashes in Florida
by: Serap Gorucu, et al.
Published: (2024-02-01)
by: Serap Gorucu, et al.
Published: (2024-02-01)
Determining the Availability of Continuous Systems in Open Pits Using ANFIS and a Simulation Model
by: Miljan Gomilanovic, et al.
Published: (2024-02-01)
by: Miljan Gomilanovic, et al.
Published: (2024-02-01)
The health, climate, and equity benefits of freight truck electrification in the United States
by: Eleanor M Hennessy, et al.
Published: (2024-01-01)
by: Eleanor M Hennessy, et al.
Published: (2024-01-01)
FILLER MATERIALS FOR MAG WELDING WITH MICROJET COOLING FOR TRUCK FRAME REPAIRS
by: Bożena SZCZUCKA-LASOTA, et al.
Published: (2018-12-01)
by: Bożena SZCZUCKA-LASOTA, et al.
Published: (2018-12-01)
Using Blockchain Technology to Foster Collaboration among Shippers and Carriers in the Trucking Industry: A Design Science Research Approach
by: Serkan Alacam, et al.
Published: (2021-06-01)
by: Serkan Alacam, et al.
Published: (2021-06-01)
Similar Items
-
Selection the optimal development options of mining operations in the Gacko coal basin
by: Stepanović Saša, et al.
Published: (2017-01-01) -
Analysis of coal quality in a function of selection level for mining at the open pit Gacko
by: Stepanović Saša, et al.
Published: (2017-01-01) -
Selection of a rational truck model for waste transport at the open pit Gacko using the ahp method
by: Stanić Nikola, et al.
Published: (2021-01-01) -
Selection the most favorable pump type and configuration of pump systems at the open pit Gračanica - Gacko
by: Stepanović Saša, et al.
Published: (2017-01-01) -
Determination the limit capacity of production the roof coal series at the open pit Gacko-Central Field in a function of use a discontinuous-combined exploitation system
by: Stanić Nikola, et al.
Published: (2019-01-01)