Application of fuzzy PERT method in project planning
In the process of project planning, it is necessary that the project manager should carefully assess the values of the input elements of the process, which are often laden with uncertainty. Since this is a project to be executed in the future, currently not all conditions are known in advance under...
| Published in: | Tehnika |
|---|---|
| Main Authors: | Toljaga-Nikolić Danijela V., Petrović Dejan Č., Suknović Milija M., Mihić Marko M. |
| Format: | Article |
| Language: | English |
| Published: |
Union of Engineers and Technicians of Serbia
2014-01-01
|
| Subjects: | |
| Online Access: | http://scindeks-clanci.ceon.rs/data/pdf/0040-2176/2014/0040-21761404679T.pdf |
Similar Items
An Evaluation of Triangular Neutrosophic PERT Analysis for Real-Life Project Time and Cost Estimation
by: S. Priyadharsini, et al.
Published: (2024-01-01)
by: S. Priyadharsini, et al.
Published: (2024-01-01)
Neutrosophic Statistics for Project Management. Application to a Computer System Project
by: Ariel Romero Fernández, et al.
Published: (2021-07-01)
by: Ariel Romero Fernández, et al.
Published: (2021-07-01)
Optimalisasi penjadwalan proyek pembangunan pabrik kelapa sawit dengan menggunakan metode PERT dan CPM pada PT. Bintang Riski Abadi
by: Rio Marpaung, et al.
Published: (2022-08-01)
by: Rio Marpaung, et al.
Published: (2022-08-01)
Uncertain project network analysis with fuzzy–PERT and Interval Type–2 fuzzy activity durations
by: Juan Carlos Figueroa–García, et al.
Published: (2023-04-01)
by: Juan Carlos Figueroa–García, et al.
Published: (2023-04-01)
Analysis of construction dynamic plan using fuzzy critical path method
by: Kurij Kazimir V., et al.
Published: (2014-01-01)
by: Kurij Kazimir V., et al.
Published: (2014-01-01)
Critical Path Method & Project Evaluation and Review Technique: A Neutrosophic Review
by: Navya Pratyusha M, et al.
Published: (2024-05-01)
by: Navya Pratyusha M, et al.
Published: (2024-05-01)
Fuzzy Network Analysis for Projects with High Level of Risks – Uncertainty in Time and Structure
by: Reza Morovatdar, et al.
Published: (2011-03-01)
by: Reza Morovatdar, et al.
Published: (2011-03-01)
Discussion with the paper 'Project costs planning in the conditions of uncertainty' by H. Štiková
by: Igor KREJČÍ, et al.
Published: (2014-11-01)
by: Igor KREJČÍ, et al.
Published: (2014-11-01)
Application of Critical Path Method and Fuzzy Logic in Optimizing Bottled Drinking Water Production
by: Wanda Wira Yudiarti, et al.
Published: (2021-05-01)
by: Wanda Wira Yudiarti, et al.
Published: (2021-05-01)
Project costs planning in the conditions of uncertainty
by: Hana Štiková
Published: (2012-02-01)
by: Hana Štiková
Published: (2012-02-01)
Schedule Risk Analysis Using Monte Carlo Simulation for Residential Projects.
by: Khalil Ismail Wali, et al.
Published: (2019-10-01)
by: Khalil Ismail Wali, et al.
Published: (2019-10-01)
Sixty years of project planning: history and future
by: Hajdu M., et al.
Published: (2017-03-01)
by: Hajdu M., et al.
Published: (2017-03-01)
Estimation Of Task Completion Times With The Use Of The PERT Method On The Example Of A Real Construction Project
by: Plebankiewicz E., et al.
Published: (2015-09-01)
by: Plebankiewicz E., et al.
Published: (2015-09-01)
Fuzzy Logic for Intelligent Control System Using Soft Computing Applications
by: Catalin Dumitrescu, et al.
Published: (2021-04-01)
by: Catalin Dumitrescu, et al.
Published: (2021-04-01)
Determining critical paths of projects by a new hybrid approach based on developed MULTIMOORA and SWARA methods under consideration of time, cost, quality, risk and safety criteria in an interval type-2 fuzzy environment
by: Yahya Dorfeshan, et al.
Published: (2022-12-01)
by: Yahya Dorfeshan, et al.
Published: (2022-12-01)
Fuzzy dominator coloring on fuzzy soft graphs
by: Jahir Hussain Rasheed, et al.
Published: (2023-12-01)
by: Jahir Hussain Rasheed, et al.
Published: (2023-12-01)
Bounds On Fuzzy Dominator Chromatic Number of Fuzzy Soft Bipartite Graphs
by: Jahir Hussain R, et al.
Published: (2023-03-01)
by: Jahir Hussain R, et al.
Published: (2023-03-01)
A Mobile Service Robot Global Path Planning Method Based on Ant Colony Optimization and Fuzzy Control
by: Yong Tao, et al.
Published: (2021-04-01)
by: Yong Tao, et al.
Published: (2021-04-01)
A novel ant colony algorithm for solving shortest path problems with fuzzy arc weights
by: Debora Di Caprio, et al.
Published: (2022-05-01)
by: Debora Di Caprio, et al.
Published: (2022-05-01)
Application of the pert method in the audit of business of agricultural enterprises
by: Milojević Ivan, et al.
Published: (2022-01-01)
by: Milojević Ivan, et al.
Published: (2022-01-01)
Enhanced A*–Fuzzy DWA Hybrid Algorithm for AGV Path Planning in Confined Spaces
by: Yang Xu, et al.
Published: (2025-09-01)
by: Yang Xu, et al.
Published: (2025-09-01)
Solving the problem of determining the time of work by a group of employees using fuzzy sets
by: V. A. Sudakov, et al.
Published: (2019-11-01)
by: V. A. Sudakov, et al.
Published: (2019-11-01)
Design of multi-objective mathematical model of
crashing PERT networks using genetic algorithm
by: Majid Esmaelian, et al.
Published: (2012-12-01)
by: Majid Esmaelian, et al.
Published: (2012-12-01)
Critical Graphs for R(Pn, Pm) and the Star-Critical Ramsey Number for Paths
by: Hook Jonelle
Published: (2015-11-01)
by: Hook Jonelle
Published: (2015-11-01)
Multi-Autonomous Underwater Vehicle Full-Coverage Path-Planning Algorithm Based on Intuitive Fuzzy Decision-Making
by: Xiaomeng Zhang, et al.
Published: (2024-07-01)
by: Xiaomeng Zhang, et al.
Published: (2024-07-01)
Infrastructure Construction Projects Scheduling Using Manual-Program Evaluation and Review Technique (M-PERT) Method. Case Study: Indonesian Sunda Strait Bridge
by: Reza Ferial Ashadi, et al.
Published: (2022-08-01)
by: Reza Ferial Ashadi, et al.
Published: (2022-08-01)
Efficient Procedure to Scheduling Construction Projects at the Planning Phase
by: Tsegaye Matiwos
Published: (2019-01-01)
by: Tsegaye Matiwos
Published: (2019-01-01)
On the Issue of Risk Assessment of Investment Projects Using Fuzzy Sets
by: M. SINYTSKYI
Published: (2019-12-01)
by: M. SINYTSKYI
Published: (2019-12-01)
Optimum Path Planning Using Dragonfly-Fuzzy Hybrid Controller for Autonomous Vehicle
by: Brijesh Patel, et al.
Published: (2024-01-01)
by: Brijesh Patel, et al.
Published: (2024-01-01)
SCHEDULING ANALYSIS BEDUGUL VILLA CONSTRUCTION PROJECT USING PERT AND CPM METHODS
by: Kiswara Agung Santoso, et al.
Published: (2024-03-01)
by: Kiswara Agung Santoso, et al.
Published: (2024-03-01)
RPERT: Repetitive-Projects Evaluation and Review Technique
by: Remon Fayek Aziz
Published: (2014-03-01)
by: Remon Fayek Aziz
Published: (2014-03-01)
Presenting a Fuzzy Expert System to Determine Project Completion Time in PERT Network
by: Abolfazl Kazemi, et al.
Published: (2015-09-01)
by: Abolfazl Kazemi, et al.
Published: (2015-09-01)
Research on dynamic path planning method of electric inspection robot based on fuzzy neural network
by: Yang Jiang, et al.
Published: (2023-09-01)
by: Yang Jiang, et al.
Published: (2023-09-01)
Analisis Pertukaran Waktu dan Biaya Menggunakan Metode Time Cost Trade Off (TCTO) pada Proyek Pembangunan Perumahan di PT. X
by: Nailul Izzah
Published: (2018-02-01)
by: Nailul Izzah
Published: (2018-02-01)
Application of time-cost trade-off model in forest management projects: The case of Oak decline project
by: Mehdi Zandebasiri, et al.
Published: (2019-12-01)
by: Mehdi Zandebasiri, et al.
Published: (2019-12-01)
A Global Neighborhood with Hill-Climbing Algorithm for Fuzzy Flexible Job Shop Scheduling Problem
by: Juan Carlos Seck-Tuoh-Mora, et al.
Published: (2022-11-01)
by: Juan Carlos Seck-Tuoh-Mora, et al.
Published: (2022-11-01)
Path Planning of Mobile Robot Using Fuzzy-Potential Field Method
by: Alaa A. Ahmed, et al.
Published: (2015-06-01)
by: Alaa A. Ahmed, et al.
Published: (2015-06-01)
Navigation control of unmanned aerial vehicles in dynamic collaborative indoor environment using probability fuzzy logic approach
by: Sameer Agrawal, et al.
Published: (2025-01-01)
by: Sameer Agrawal, et al.
Published: (2025-01-01)
ASSESSMENT OF SCHEDULE UNCERTAINTY AND RISK MITIGATION IN ACCELERATED BRIDGE CONSTRUCTION USING PERT
by: Alfandi Rizki Pratama Rolobessy, et al.
Published: (2025-09-01)
by: Alfandi Rizki Pratama Rolobessy, et al.
Published: (2025-09-01)
Design Genetic Algorithm To Find The Optimal Critical Path Network Project (GAOCPN)
by: Samaa Azeez, et al.
Published: (2012-07-01)
by: Samaa Azeez, et al.
Published: (2012-07-01)
Similar Items
-
An Evaluation of Triangular Neutrosophic PERT Analysis for Real-Life Project Time and Cost Estimation
by: S. Priyadharsini, et al.
Published: (2024-01-01) -
Neutrosophic Statistics for Project Management. Application to a Computer System Project
by: Ariel Romero Fernández, et al.
Published: (2021-07-01) -
Optimalisasi penjadwalan proyek pembangunan pabrik kelapa sawit dengan menggunakan metode PERT dan CPM pada PT. Bintang Riski Abadi
by: Rio Marpaung, et al.
Published: (2022-08-01) -
Uncertain project network analysis with fuzzy–PERT and Interval Type–2 fuzzy activity durations
by: Juan Carlos Figueroa–García, et al.
Published: (2023-04-01) -
Analysis of construction dynamic plan using fuzzy critical path method
by: Kurij Kazimir V., et al.
Published: (2014-01-01)