Construction Technique of Long-Span Shallow-Buried Tunnel Considering the Optimal Sequence of Pilot-Tunnel Excavation

Construction technique considering the optimal sequence of pilot-tunnel excavation was investigated in order to ensure the safety of construction process of long-span shallow-buried tunnel. Firstly, optimal comparisons of the effect of different sequence of pilot-tunnel excavation on the ground sett...

Full description

Bibliographic Details
Main Authors: Bao Jin, Yang Liu, Changxi Yang, Zhicheng Tan, Jianyang Zhang
Format: Article
Language:English
Published: Hindawi Limited 2015-01-01
Series:Advances in Materials Science and Engineering
Online Access:http://dx.doi.org/10.1155/2015/491689