Evaluation and comparison of project scheduling methods and software used in the construction industry

<p>The objectives of this thesis are to evaluate scheduling methods and most common construction project management software (CPMS) which are Primavera and MS Project, and to determine most widely used project scheduling techniques and CPMS with a survey. The thesis focus on project scheduling...

Full description

Bibliographic Details
Main Author: Parlak, Mehmet
Other Authors: Dennis D. Truax
Format: Others
Language:en
Published: MSSTATE 2016
Subjects:
Online Access:http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/
id ndltd-MSSTATE-oai-library.msstate.edu-etd-06302016-143304
record_format oai_dc
spelling ndltd-MSSTATE-oai-library.msstate.edu-etd-06302016-1433042019-05-15T18:44:00Z Evaluation and comparison of project scheduling methods and software used in the construction industry Parlak, Mehmet Civil and Environmental Engineering <p>The objectives of this thesis are to evaluate scheduling methods and most common construction project management software (CPMS) which are Primavera and MS Project, and to determine most widely used project scheduling techniques and CPMS with a survey. The thesis focus on project scheduling since it is very deterministic for project success. Evaluation results indicate that, Gantt Chart Method and PDM are useful for small to medium projects, CPM is for complex projects, PERT is for uncertain projects, and LOB Technique is for repetitive projects. The comparison between Primavera and MS Project show that Primavera is more robust, professional, and detailed while MS Project is cheaper and easier. The survey was completed with 22 participants from construction companies in the US and Turkey and the results demonstrate CPM and Gantt Chart Method are the most common methods. Also, MS Project is the most widely used CPMS followed by the Primavera. </p> Dennis D. Truax James L. Martin Imad Aleithawe MSSTATE 2016-07-22 text application/pdf http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/ http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/ en unrestricted I hereby certify that, if appropriate, I have obtained and attached hereto a written permission statement from the owner(s) of each third party copyrighted matter to be included in my thesis, Dissertation, or project report, allowing distribution as specified below. I certify that the version I submitted is the same as that approved by my advisory committee. I hereby grant to Mississippi State University Libraries or its agents the non-exclusive license to archive and make accessible, under the conditions specified below, my thesis, Dissertation, or project report in whole or in part in all forms of media, now or hereafter known. I retain all other ownership rights to the copyright of the thesis, Dissertation or project report. I also retain the right to use in future works (such as articles or books) all or part of this thesis, Dissertation, or project report.
collection NDLTD
language en
format Others
sources NDLTD
topic Civil and Environmental Engineering
spellingShingle Civil and Environmental Engineering
Parlak, Mehmet
Evaluation and comparison of project scheduling methods and software used in the construction industry
description <p>The objectives of this thesis are to evaluate scheduling methods and most common construction project management software (CPMS) which are Primavera and MS Project, and to determine most widely used project scheduling techniques and CPMS with a survey. The thesis focus on project scheduling since it is very deterministic for project success. Evaluation results indicate that, Gantt Chart Method and PDM are useful for small to medium projects, CPM is for complex projects, PERT is for uncertain projects, and LOB Technique is for repetitive projects. The comparison between Primavera and MS Project show that Primavera is more robust, professional, and detailed while MS Project is cheaper and easier. The survey was completed with 22 participants from construction companies in the US and Turkey and the results demonstrate CPM and Gantt Chart Method are the most common methods. Also, MS Project is the most widely used CPMS followed by the Primavera. </p>
author2 Dennis D. Truax
author_facet Dennis D. Truax
Parlak, Mehmet
author Parlak, Mehmet
author_sort Parlak, Mehmet
title Evaluation and comparison of project scheduling methods and software used in the construction industry
title_short Evaluation and comparison of project scheduling methods and software used in the construction industry
title_full Evaluation and comparison of project scheduling methods and software used in the construction industry
title_fullStr Evaluation and comparison of project scheduling methods and software used in the construction industry
title_full_unstemmed Evaluation and comparison of project scheduling methods and software used in the construction industry
title_sort evaluation and comparison of project scheduling methods and software used in the construction industry
publisher MSSTATE
publishDate 2016
url http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/
work_keys_str_mv AT parlakmehmet evaluationandcomparisonofprojectschedulingmethodsandsoftwareusedintheconstructionindustry
_version_ 1719086211639803904