Evaluation and comparison of project scheduling methods and software used in the construction industry
<p>The objectives of this thesis are to evaluate scheduling methods and most common construction project management software (CPMS) which are Primavera and MS Project, and to determine most widely used project scheduling techniques and CPMS with a survey. The thesis focus on project scheduling...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en |
Published: |
MSSTATE
2016
|
Subjects: | |
Online Access: | http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/ |
id |
ndltd-MSSTATE-oai-library.msstate.edu-etd-06302016-143304 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-MSSTATE-oai-library.msstate.edu-etd-06302016-1433042019-05-15T18:44:00Z Evaluation and comparison of project scheduling methods and software used in the construction industry Parlak, Mehmet Civil and Environmental Engineering <p>The objectives of this thesis are to evaluate scheduling methods and most common construction project management software (CPMS) which are Primavera and MS Project, and to determine most widely used project scheduling techniques and CPMS with a survey. The thesis focus on project scheduling since it is very deterministic for project success. Evaluation results indicate that, Gantt Chart Method and PDM are useful for small to medium projects, CPM is for complex projects, PERT is for uncertain projects, and LOB Technique is for repetitive projects. The comparison between Primavera and MS Project show that Primavera is more robust, professional, and detailed while MS Project is cheaper and easier. The survey was completed with 22 participants from construction companies in the US and Turkey and the results demonstrate CPM and Gantt Chart Method are the most common methods. Also, MS Project is the most widely used CPMS followed by the Primavera. </p> Dennis D. Truax James L. Martin Imad Aleithawe MSSTATE 2016-07-22 text application/pdf http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/ http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/ en unrestricted I hereby certify that, if appropriate, I have obtained and attached hereto a written permission statement from the owner(s) of each third party copyrighted matter to be included in my thesis, Dissertation, or project report, allowing distribution as specified below. I certify that the version I submitted is the same as that approved by my advisory committee. I hereby grant to Mississippi State University Libraries or its agents the non-exclusive license to archive and make accessible, under the conditions specified below, my thesis, Dissertation, or project report in whole or in part in all forms of media, now or hereafter known. I retain all other ownership rights to the copyright of the thesis, Dissertation or project report. I also retain the right to use in future works (such as articles or books) all or part of this thesis, Dissertation, or project report. |
collection |
NDLTD |
language |
en |
format |
Others
|
sources |
NDLTD |
topic |
Civil and Environmental Engineering |
spellingShingle |
Civil and Environmental Engineering Parlak, Mehmet Evaluation and comparison of project scheduling methods and software used in the construction industry |
description |
<p>The objectives of this thesis are to evaluate scheduling methods and most common construction project management software (CPMS) which are Primavera and MS Project, and to determine most widely used project scheduling techniques and CPMS with a survey. The thesis focus on project scheduling since it is very deterministic for project success. Evaluation results indicate that, Gantt Chart Method and PDM are useful for small to medium projects, CPM is for complex projects, PERT is for uncertain projects, and LOB Technique is for repetitive projects. The comparison between Primavera and MS Project show that Primavera is more robust, professional, and detailed while MS Project is cheaper and easier. The survey was completed with 22 participants from construction companies in the US and Turkey and the results demonstrate CPM and Gantt Chart Method are the most common methods. Also, MS Project is the most widely used CPMS followed by the Primavera. </p> |
author2 |
Dennis D. Truax |
author_facet |
Dennis D. Truax Parlak, Mehmet |
author |
Parlak, Mehmet |
author_sort |
Parlak, Mehmet |
title |
Evaluation and comparison of project scheduling methods and software used in the construction industry |
title_short |
Evaluation and comparison of project scheduling methods and software used in the construction industry |
title_full |
Evaluation and comparison of project scheduling methods and software used in the construction industry |
title_fullStr |
Evaluation and comparison of project scheduling methods and software used in the construction industry |
title_full_unstemmed |
Evaluation and comparison of project scheduling methods and software used in the construction industry |
title_sort |
evaluation and comparison of project scheduling methods and software used in the construction industry |
publisher |
MSSTATE |
publishDate |
2016 |
url |
http://sun.library.msstate.edu/ETD-db/theses/available/etd-06302016-143304/ |
work_keys_str_mv |
AT parlakmehmet evaluationandcomparisonofprojectschedulingmethodsandsoftwareusedintheconstructionindustry |
_version_ |
1719086211639803904 |