A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC

碩士 === 國立雲林科技大學 === 工業工程與管理研究所碩士班 === 91 === Autocorrelation commonly exists in the process industry. With reduced ARL, autocorrelation leads to increase the false alarm rate of control charts. It is required to deal with autocorrelation, because it can cause significant deterioration of control ch...

Full description

Bibliographic Details
Main Authors: Shu-Lan Lu, 盧淑蘭
Other Authors: Chau-Chen Torng
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/92426406850012769091
id ndltd-TW-091YUNT5031011
record_format oai_dc
spelling ndltd-TW-091YUNT50310112015-10-13T13:39:19Z http://ndltd.ncl.edu.tw/handle/92426406850012769091 A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC 運用EPC整合SPC進行自我相關性資料處理之探討 Shu-Lan Lu 盧淑蘭 碩士 國立雲林科技大學 工業工程與管理研究所碩士班 91 Autocorrelation commonly exists in the process industry. With reduced ARL, autocorrelation leads to increase the false alarm rate of control charts. It is required to deal with autocorrelation, because it can cause significant deterioration of control charting performance. Time series approach is generally used to describe the structure of autocorrelation. AR(1) and AR(2) models are investigated, and disturbances considered are stepped or linear types. Recent researches on process control find that integration of EPC and SPC has good performance. Purpose of this research is to study integrated EPC and SPC method in dealing with autocorrelated data. Three control charts are considered: Shwhart、CUSUM and EWMA chart. From this study,results show that when the level of autocorrelation is low, the result of integrated EPC and SPC is similar to time series model approach. However, when data with high autocorrelation, integrated EPC and SPC is better than time series model approach. CUSUM and EWMA charts are better than Shewhart chart in these situations:(1) in stepped disturbance, low level of autocorrelation and range of process shifts is 0.5 to 2 time standard deviation; (2) in stepped disturbance, high level of autocorrelation and range of process shifts is 1 to 3 time standard deviation; (3)in linear disturbance, the slope of process shifts is between 0.05 and 0.5. Therefore, it is a good choice using CUSUM or EWMA charts for process monitoring under these situations. Chau-Chen Torng 童超塵 2003 學位論文 ; thesis 65 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立雲林科技大學 === 工業工程與管理研究所碩士班 === 91 === Autocorrelation commonly exists in the process industry. With reduced ARL, autocorrelation leads to increase the false alarm rate of control charts. It is required to deal with autocorrelation, because it can cause significant deterioration of control charting performance. Time series approach is generally used to describe the structure of autocorrelation. AR(1) and AR(2) models are investigated, and disturbances considered are stepped or linear types. Recent researches on process control find that integration of EPC and SPC has good performance. Purpose of this research is to study integrated EPC and SPC method in dealing with autocorrelated data. Three control charts are considered: Shwhart、CUSUM and EWMA chart. From this study,results show that when the level of autocorrelation is low, the result of integrated EPC and SPC is similar to time series model approach. However, when data with high autocorrelation, integrated EPC and SPC is better than time series model approach. CUSUM and EWMA charts are better than Shewhart chart in these situations:(1) in stepped disturbance, low level of autocorrelation and range of process shifts is 0.5 to 2 time standard deviation; (2) in stepped disturbance, high level of autocorrelation and range of process shifts is 1 to 3 time standard deviation; (3)in linear disturbance, the slope of process shifts is between 0.05 and 0.5. Therefore, it is a good choice using CUSUM or EWMA charts for process monitoring under these situations.
author2 Chau-Chen Torng
author_facet Chau-Chen Torng
Shu-Lan Lu
盧淑蘭
author Shu-Lan Lu
盧淑蘭
spellingShingle Shu-Lan Lu
盧淑蘭
A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC
author_sort Shu-Lan Lu
title A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC
title_short A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC
title_full A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC
title_fullStr A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC
title_full_unstemmed A Study of Dealing With theAutocorrelated Data by Integrating EPC and SPC
title_sort study of dealing with theautocorrelated data by integrating epc and spc
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/92426406850012769091
work_keys_str_mv AT shulanlu astudyofdealingwiththeautocorrelateddatabyintegratingepcandspc
AT lúshūlán astudyofdealingwiththeautocorrelateddatabyintegratingepcandspc
AT shulanlu yùnyòngepczhěnghéspcjìnxíngzìwǒxiāngguānxìngzīliàochùlǐzhītàntǎo
AT lúshūlán yùnyòngepczhěnghéspcjìnxíngzìwǒxiāngguānxìngzīliàochùlǐzhītàntǎo
AT shulanlu studyofdealingwiththeautocorrelateddatabyintegratingepcandspc
AT lúshūlán studyofdealingwiththeautocorrelateddatabyintegratingepcandspc
_version_ 1717739358860083200