-
1“... for construction structures, concrete absenence state analysis and assessment. To 2003-2008(6 year ) of soil...”
Get full text
Others -
2“... that equalized contours of the principal stress increment (Δσ1) propagation in soil between toe of slope...”
Get full text
Others -
3“... in the engineering practice of Taiwan as a remedial measure for ground subsidence or uncontrolled groundwater flow...”
Get full text
Others -
4“...碩士 === 逢甲大學 === 土木工程所 === 93 === Construction engineering is a project of vital and lasting...”
Get full text
Others -
5“.... The treatment of “excess soils” developed by Ministry, and the idea of “resource management” and “no discard...”
Get full text
Others -
6“...碩士 === 國立中央大學 === 土木工程研究所 === 92 === ABSTRACT During earthquake, foundation soils liquefaction...”
Get full text
Others -
7“... and ecological engineering. In this research, the future ecological wish on national road build is distinguished...”
Get full text
Others -
8“...碩士 === 國立高雄第一科技大學 === 營建工程所 === 93 === Embankments engineering was traditional structured with RC...”
Get full text
Others -
9“...碩士 === 國立臺灣科技大學 === 營建工程系 === 95 === The subgrade soil often lies above the groundwater level...”
Get full text
Others -
10“... ground surface. The soil above the groundwater level is unsaturated and the characteristic of mechanics...”
Get full text
Others -
11“... developed in recent studies for efficiently representing the dynamic behavior of unbounded soil. Those...”
Get full text
Others -
12“... of the plate-like structure in water resource engineering. Promising results were shown for plates...”
Get full text
Others -
13“... executed by Soil and Water Conservation Bureau, Council of Agriculture, Executive Yuan in these years...”
Get full text
Others -
14“... data (i.e., macro-parameters). The micro-parameters included friction coefficient (fric) among soil...”
Get full text
Others -
15“... of ecotechnology as well as soil & water conservation. Second, by using the concept of vegetation engineering...”
Get full text
Others -
16“..., it took NT$ 384/m3 of soil of remediation engineering expenses, which is less than that of NT$ 647~5174/m3...”
Get full text
Others -
17“...), and Standard Penetration Test (SPT) are three in-situ tests of the geotechnical engineering. The mechanism...”
Get full text
Others -
18“...” was the best way used in ecological engineering. However, for the sake of safety, “the soil dikes” which...”
Get full text
Others -
19“...、decreased different parts of coarse aggregates、take different ratio of admixture, fly ash、slag、soil...”
Get full text
Others -
20“... of engineering that comprises complexities and uncertainties. Therefore, tunnel construction has become a...”
Get full text
Others