Crew Scheduling Considering both Crew Duty Time Difference and Cost on Urban Rail System

Urban rail crew scheduling problem is to allocate train services to crews based on a given train timetable while satisfying all the operational and contractual requirements. In this paper, we present a new mathematical programming model with the aim of minimizing both the related costs of crew duty...

وصف كامل

التفاصيل البيبلوغرافية
الحاوية / القاعدة:Promet (Zagreb)
المؤلفون الرئيسيون: Wenliang Zhou, Xia Yang, Lianbo Deng, Jin Qin
التنسيق: مقال
اللغة:الإنجليزية
منشور في: University of Zagreb, Faculty of Transport and Traffic Sciences 2016-11-01
الموضوعات:
الوصول للمادة أونلاين:https://traffic.fpz.hr/index.php/PROMTT/article/view/1842