Unit commitment with frequency‐arresting adequacy constraint: Modelling and pricing aspects
Abstract Frequency‐arresting (FA) adequacy has received an increasing attention in operation of power systems with intermittent, electronically connected wind and sfolar generation. Presence of high penetration of renewable energy leads to reduced amount of inertia in the power system and the need f...
| Published in: | IET Generation, Transmission & Distribution |
|---|---|
| Main Authors: | , , |
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-12-01
|
| Online Access: | https://doi.org/10.1049/gtd2.12641 |
