Optimizing UE Power Efficiency: AI/ML Approach for Upgrade Time Determination
The transition of Control Plane (CP) block functions into software entities, as proposed by 3GPP, necessitates periodic downtime for maintenance activities such as software upgrades or failures. This downtime requires the disconnection of all User Equipment (UE) connections to the CP, triggering the...
| الحاوية / القاعدة: | IEEE Access |
|---|---|
| المؤلفون الرئيسيون: | , , , , |
| التنسيق: | مقال |
| اللغة: | الإنجليزية |
| منشور في: |
IEEE
2024-01-01
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://ieeexplore.ieee.org/document/10623456/ |
