An Iterative Re-Optimization Framework for the Dynamic Scheduling of Crossover Yard Cranes with Uncertain Delivery Sequences

In yard-crane scheduling problems, as loading operations take priority over unloading, the delivery sequence of unloading from the quaysides to the yard is uncertain. The delivery sequence changes may make crane scheduling more difficult. As a result, the crane operations schedules developed statica...

Full description

Bibliographic Details
Published in:Journal of Marine Science and Engineering
Main Authors: Yao-Zong Wang, Zhi-Hua Hu
Format: Article
Language:English
Published: MDPI AG 2023-04-01
Subjects:
Online Access:https://www.mdpi.com/2077-1312/11/5/892