Fault Analysis of Qingdao Metro Line 2 Sliding Plug Door System

During the early operation stage of Qingdao metro line 2, the trains were delayed many times caused by sliding plug door fault. To assure the train's safety operation, this paper focused on the typical faults in the early operation stage of Qingdao metro line 2, analyzed the faults from train o...

Full description

Bibliographic Details
Published in:机车电传动
Main Authors: Jizhen HU, Changyi GONG, Wenchao WANG
Format: Article
Language:Chinese
Published: Editorial Department of Electric Drive for Locomotives 2021-03-01
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2021.02.005